Remaking the San Francisco-Oakland Bay Bridge : A Case of Shadowboxing with Nature
暂无分享,去创建一个
1. Mind over Matter, 2. Field Guide to Megaproject Interpretation, Part I: Time in Suspension, 3. Past as Prologue, 4. Engineering between the Fault Lines, Part II: A Race Against Time, 5. Shockwaves by Design, 6. Ground Motions when Pedalling for a Pathway and Train Tracks, Part III: Hurry Up and Wait...and Wait, 7. Freefalling to Vertigo, 8. Back to the Future: the 'Big One' of Skyrocketing Costs, 9. Aftershock: Hubris and Shadowboxing with Nature