Reconfiguration of assembly systems: From conveyor assembly line to serus

Abstract Confronted with the dynamic and complex market environments, the traditional conveyor assembly line can no longer meet customers’ demands effectively. The way of reconfiguring conveyor assembly line to a more flexible manufacturing system has been attracting considerable attention both in the academics and production practices. Seru system, also called assembly cell system, is regarded as one of the most successful innovations of manufacturing system in reconfiguring conveyor assembly line. Such a manufacturing system merges considerable flexibility of job shops and high efficiency of conveyor assembly lines to some extent. In this paper, we investigate the problem of how to reconfigure conveyor assembly line to serus . A comprehensive mathematical model incorporating two issues of how many serus should be established and how many workers should be assigned to each seru is developed. Then the model is investigated by an industrial case and compared to Kaku's model with respect to the selected plan. The computation results validate that the proposed model is more suitable to analyze the reconfiguration problems from conveyor assembly line to serus .

[1]  O. A. Joseph,et al.  Analysis of dynamic due-date assignment models in a flexible manufacturing system , 2011 .

[2]  Ikou Kaku,et al.  Modeling and numerical analysis of line-cell conversion problems , 2009 .

[3]  Danny J. Johnson,et al.  A framework for reducing manufacturing throughput time , 2003 .

[4]  D. Strickland,et al.  The α2‐Macroglobulin Receptor/Low Density Lipoprotein Receptor‐Related Protein and the Receptor‐Associated Protein , 1994 .

[5]  Yu Sakazume,et al.  Is Japanese Cell Manufacturing a New System? : A Comparative Study between Japanese Cell Manufacturing and Cellular Manufacturing( Production and Logistics) , 2004 .

[6]  Tomas Engström,et al.  Some considerations relating to the reintroduction of assembly lines in the Swedish automotive industry , 2004 .

[7]  Dario Ikuo Miyake,et al.  The shift from belt conveyor line to work-cell based assembly systems to cope with increasing demand variation in Japanese industries , 2006 .

[8]  Danny J. Johnson,et al.  Converting assembly lines to assembly cells at sheet metal products: insights on performance improvements , 2005 .

[9]  Yoram Koren,et al.  Design of reconfigurable manufacturing systems , 2010 .

[10]  Gürsel A. Süer,et al.  Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells , 2008 .

[11]  Yong Yin,et al.  A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing , 2008 .

[12]  Katsuhide Isa,et al.  Cell Production and Workplace Innovation in Japan: Toward a New Model for Japanese Manufacturing? , 2002 .

[13]  Yu-Ying Huang,et al.  How to achieve leagility: A case study of a personal computer original equipment manufacturer in Taiwan , 2010 .

[14]  Reza H. Ahmadi,et al.  A mini-line approach for pull production , 2000, Eur. J. Oper. Res..

[15]  Ikou Kaku,et al.  Seru: The Organizational Extension of JIT for a Super-Talent Factory , 2012, Int. J. Strateg. Decis. Sci..

[16]  F. R. Jacobs,et al.  Impact of work teams: a comparison study of assembly cells and assembly line for a variety of operating environments , 2004 .

[17]  İhsan Erozan A hybrid methodology for restructuring decision of a manufacturing system: A case study , 2011 .

[18]  Yong Yin,et al.  Seru Seisan‐ an innovation of the production management Mode in Japan , 2010 .

[19]  Xiuli Meng,et al.  Modeling of reconfigurable manufacturing systems based on colored timed object-oriented Petri nets , 2010 .

[20]  Yong Yin,et al.  The Evolution of Seru Production Systems Throughout Canon , 2008 .

[21]  Hirokazu Kono,et al.  Fundamental Principles and Viewpoints of Manufacturing Revolution Activities , 2006 .

[22]  Yu Sakazume,et al.  Conditions for Successful Implementation of Assembly Cells , 2006 .