Modeling the integrated mine-to-client supply chain: a survey
暂无分享,去创建一个
Laura Bahiense | Edilson F. Arruda | Lino Guimarães Marujo | João Marcelo Leal Gomes Leite | L. Bahiense | E. Arruda | L. Marujo
[1] Jean-Philippe P. Richard,et al. A Two-Model Solution Approach for the Monthly Coal Train Reservations Planning Problem , 2016, Transp. Sci..
[2] Xiaoxiao Li,et al. Optimization for China’s coal flow based on matching supply and demand sides , 2018 .
[3] Lou Caccetta,et al. Equipment Selection for Surface Mining: A Review , 2014, Interfaces.
[4] H. Askari-Nasab,et al. A new model for automated pushback selection , 2020, Comput. Oper. Res..
[5] Erkan Topal,et al. Integrated short and medium term underground mine production scheduling , 2012 .
[6] Salih Ramazan,et al. Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability , 2004 .
[7] Horacio J. Marquez,et al. A stochastic optimization approach to mine truck allocation , 2005 .
[8] Erkan Topal,et al. Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming , 2010 .
[9] Yan-Fen Liao,et al. New hybrid optimization model for power coal blending , 2005, 2005 International Conference on Machine Learning and Cybernetics.
[10] J. Amaya,et al. A scalable approach to optimal block scheduling , 2009 .
[11] Reza Shakoor Shahabi,et al. Cutoff grade optimization in open pit mines using genetic algorithm , 2017 .
[12] Darwin Klingman,et al. Integer Programming for Optimal Phosphate-Mining Strategies , 1988 .
[13] Snehamoy Chatterjee,et al. Production phase and ultimate pit limit design under commodity price uncertainty , 2016, Eur. J. Oper. Res..
[14] Johan W. Joubert,et al. Scheduling at coal handling facilities using Simulated Annealing , 2008, Math. Methods Oper. Res..
[15] H. Christopher Frey,et al. Coal blending optimization under uncertainty , 1995 .
[16] Roussos Dimitrakopoulos,et al. Simultaneous Stochastic Optimization of Mining Complexes and Mineral Value Chains , 2017, Mathematical Geosciences.
[17] C. Dai,et al. A simulation-based fuzzy possibilistic programming model for coal blending management with consideration of human health risk under uncertainty , 2014 .
[18] Roussos Dimitrakopoulos,et al. Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design , 2002 .
[19] Alexandra M. Newman,et al. Optimizing the open pit-to-underground mining transition , 2017, Eur. J. Oper. Res..
[20] Roussos G. Dimitrakopoulos,et al. Global optimization of open pit mining complexes with uncertainty , 2016, Appl. Soft Comput..
[21] Erkan Topal,et al. A new algorithm for stope boundary optimization , 2010 .
[22] Sven Schellenberg,et al. Benchmarks for the Coal Processing and Blending Problem , 2016, GECCO.
[23] Ü. Sakalli,et al. Stochastic optimization for blending problem in brass casting industry , 2011, Ann. Oper. Res..
[24] Alexandra M. Newman,et al. Using aggregation to optimize long-term production planning at an underground mine , 2007, Eur. J. Oper. Res..
[25] Wilfred Candler,et al. Coal blending - with acceptance sampling , 1989, Comput. Oper. Res..
[26] Alexandra M. Newman,et al. A sliding time window heuristic for open pit mine block sequencing , 2011, Optim. Lett..
[27] Erkan Topal,et al. A heuristic approach to optimal design of an underground mine stope layout , 2015, Appl. Soft Comput..
[28] Amina Lamghari,et al. Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty , 2013, Eur. J. Oper. Res..
[29] A. Arigoni. Optimization techniques in coal markets: A global cost minimization and a multi-stage procurement strategy , 2016 .
[30] Rajive Ganguli,et al. A genetic algorithms approach for grade control planning in a bauxite deposit , 2005 .
[31] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[32] Parag C. Pendharkar,et al. Nonlinear programming and genetic search application for production scheduling in coal mines , 2000, Ann. Oper. Res..
[33] Yu Zhang,et al. A dynamic optimization model of an integrated coal supply chain system and its application , 2009 .
[34] Kjetil Fagerholt,et al. Ship routing and scheduling in the new millennium , 2013, Eur. J. Oper. Res..
[35] Chia-Yon Chen,et al. A cost minimization model for coal import strategy , 1996 .
[36] Kjetil Fagerholt,et al. Ship Routing and Scheduling: Status and Perspectives , 2004, Transp. Sci..
[37] Qingcheng Zeng,et al. Model Integrating Fleet Design and Ship Routing Problems for Coal Shipping , 2007, International Conference on Computational Science.
[38] Erkan Topal,et al. Optimising the long-term mine waste management and truck schedule in a large-scale open pit mine , 2016 .
[39] M. Chakraborty,et al. Multicriteria decision making for optimal blending for beneficiation of coal: a fuzzy programming approach , 2005 .
[40] Stefan Voß,et al. Container terminal operation and operations research - a classification and literature review , 2004, OR Spectr..
[41] Tatsushi Nishi,et al. Simultaneous Optimization of Storage Allocation and Routing Problems for Belt-conveyor Transportation , 2007 .
[42] Claude-Guy Quimper,et al. Integration of AI and OR Techniques in Constraint Programming , 2016, Lecture Notes in Computer Science.
[43] M. Ataee-pour. A Critical Survey of the Existing Stope Layout Optimization Techniques , 2005 .
[44] Erkan Topal,et al. Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming , 2014 .
[45] Pourrahimian Yashar,et al. A multi-step approach for block-cave production scheduling optimization , 2013 .
[46] Roussos Dimitrakopoulos,et al. Globally optimising open-pit and underground mining operations under geological uncertainty , 2016 .
[47] Alan T. Murray,et al. HANDBOOK OF OPERATIONS RESEARCH IN NATURAL RESOURCES , 2007 .
[48] Erkan Topal,et al. Flexible open-pit mine design under uncertainty , 2011 .
[49] Ümit Sami Sakalli,et al. Strong guidance on mitigating the effects of uncertainties in the brass casting blending problem: a hybrid optimization approach , 2013, J. Oper. Res. Soc..
[50] Saeid Nahavandi,et al. Complex Simulation of Stockyard Mining Operations , 2015 .
[51] Jon C. Yingling,et al. A review of computer-based truck dispatching strategies for surface mining operations , 1994 .
[52] Angappa Gunasekaran,et al. A goal programming model for the coal blending problem , 1995 .
[53] Morteza Osanloo,et al. A decision support system for determination of a sustainable pit limit , 2017 .
[54] X. Xia,et al. Modelling of coal trade process for the logistics enterprise and its optimisation with stochastic predictive control , 2016 .
[55] Javad Sattarvand,et al. Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization , 2016, Comput. Geosci..
[56] Feng Gao,et al. Purchasing and transport scheduling based on scenario tree in coal maritime supply chain with stochastic demand , 2014, Proceeding of the 11th World Congress on Intelligent Control and Automation.
[57] R. Dimitrakopoulos,et al. Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping , 2007 .
[58] G. Belov,et al. Exploration of models for a cargo assembly planning problem , 2015, 1504.00445.
[59] Hanif D. Sherali,et al. Models for a coal blending and distribution problem , 1993 .
[60] Shamil Naoum,et al. A hybrid knowledge base system and genetic algorithms for equipment selection , 2000 .
[61] Eduardo Moreno,et al. A New Algorithm for the Open-Pit Mine Production Scheduling Problem , 2012, Oper. Res..
[62] Marcus Brazil,et al. Optimisation in underground mining , 2007 .
[63] R. V. Ramani,et al. Generalized multiperiod MIP model for production scheduling and processing facilities selection and location , 1986 .
[64] Roussos Dimitrakopoulos,et al. Conditional simulation algorithms for modelling orebody uncertainty in open pit optimisation , 1998 .
[65] H Eivazy,et al. A mixed integer linear programming model for short-term open pit mine production scheduling , 2012 .
[66] Erhan Kozan,et al. Operations research for mining : a classification and literature review , 2011 .
[67] J. M. Henderson. A Short-Run Model for the Coal Industry , 1955 .
[68] Michel Gamache,et al. An enumeration algorithm for solving the fleet management problem in underground mines , 2006, Comput. Oper. Res..
[69] Saeid R. Dindarloo,et al. A stochastic simulation framework for truck and shovel selection and sizing in open pit mines , 2015 .
[70] Erhan Kozan,et al. A new constraint programming approach for optimising a coal rail system , 2016, Optim. Lett..
[71] A. Mehrez,et al. A Production Problem in Phosphate Mining , 1985 .
[72] Kwame Awuah-Offei,et al. Large-scale open pit production scheduling using Mixed Integer Linear Programming , 2010 .
[73] Jayendran Venkateswaran,et al. Decentralised decision-making in a multi-party supply chain , 2016 .
[74] Terry L. Esper,et al. Supply Chain Management Strategy , 2010 .
[75] Saibal Ray,et al. Supply chain disruptions : theory and practice of managing risk , 2012 .
[76] M. Govinda Raj,et al. Production optimisation using simulation models in mines: a critical review , 2009 .
[77] A. S. Nhleko,et al. A review of underground stope boundary optimization algorithms , 2018 .
[78] Martin W. P. Savelsbergh,et al. Cargo assembly planning , 2015, EURO J. Transp. Logist..
[79] R Mcnearny. SIMULATION OF A CONVEYOR BELT NETWORK AT AN UNDERGROUND COAL MINE , 2000 .
[80] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[81] C. Musingwini,et al. Presidential address: Optimization in underground mine planning-developments and opportunities. , 2016 .
[82] Dorit S. Hochbaum,et al. Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem , 2000, Oper. Res..
[83] H. Askari-Nasab,et al. Mixed integer linear programming formulations for open pit production scheduling , 2011 .
[84] Amina Lamghari,et al. A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty , 2014, J. Oper. Res. Soc..
[85] Alexandra M. Newman,et al. Linear models for stockpiling in open-pit mine production scheduling problems , 2017, Eur. J. Oper. Res..
[86] Horst A. Eiselt,et al. A bibliography for some fundamental problem categories in discrete location science , 2008, Eur. J. Oper. Res..
[87] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[88] Erkan Topal,et al. A new MIP model for mine equipment scheduling by minimizing maintenance cost , 2010, Eur. J. Oper. Res..
[89] W. Matthew Carlyle,et al. Underground Planning at Stillwater Mining Company , 2001, Interfaces.
[90] Bruce W. Patty. Handbook of operations research applications at railroads , 2015 .
[91] Andreas T. Ernst,et al. Rail schedule optimisation in the hunter valley coal chain , 2015, RAIRO Oper. Res..
[92] Brenan J. McCarragher,et al. A Queueing Model for the Design and Analysis of a Mining Stockyard , 1999, Discret. Event Dyn. Syst..
[93] Alfredo Candia-Véjar,et al. A multi-objective optimization model for the design of an effective decarbonized supply chain in mining , 2017 .
[94] Kjetil Fagerholt,et al. Production , Manufacturing and Logistics Maritime inventory routing with multiple products : A case study from the cement industry , 2010 .
[95] Peter J. Stuckey,et al. Short-term planning for open pit mines: a review , 2019 .
[96] Parag C. Pendharkar. A fuzzy linear programming model for production planning in coal mines , 1997, Comput. Oper. Res..
[97] Carsten Drebenstedt,et al. Real options decision framework: Strategic operating policies for open pit mine planning , 2016 .
[98] Guohe Huang,et al. An Inexact Fuzzy Programming Approach for Power Coal Blending , 2015 .
[99] Erhan Kozan,et al. Optimising a coal rail network under capacity constraints , 2011 .
[100] P. Benalcazar,et al. The storage location problem in a coal supply chain: background and methodological approach , 2017 .
[101] Erkan Topal,et al. An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling , 2010 .
[102] James Mitchell Henderson. The efficiency of the coal industry : an application of linear programming , 1958 .
[103] Alexandra M. Newman,et al. Operations research in the natural resource industry , 2012, Int. Trans. Oper. Res..
[104] Luis Montiel,et al. A heuristic approach for the stochastic optimization of mine production schedules , 2017, J. Heuristics.
[105] Hanan Luss,et al. Operations Research and Capacity Expansion Problems: A Survey , 1982, Oper. Res..
[106] Diagnostische Kriterien des Frühdiabetes , 1968 .
[107] David Avis,et al. Optimized open pit mine design, pushbacks and the gap problem—a review , 2014, Journal of Mining Science.
[108] L. Shih. Planning of fuel coal imports using a mixed integer programming method , 1997 .
[109] J. Elbrond,et al. Truck dispatching in an open pit mine , 1989 .
[110] Erkan Topal,et al. Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling , 2008 .
[111] Rui-Jie Zhou,et al. Joint capacity planning and distribution network optimization of coal supply chains under uncertainty , 2018 .
[112] Arunachalam Ravindran,et al. Optimal Location of Coal Blending Plants by Mixed-Integer Programming , 1980 .
[113] Ngoc Luan Mai,et al. A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming , 2019, Resources Policy.
[114] J. Hyam Rubinstein,et al. Combined optimisation of an open-pit mine outline and the transition depth to underground mining , 2018, Eur. J. Oper. Res..
[115] J. Benndorf. Application of efficient methods of conditional simulation for optimising coal blending strategies in large continuous open pit mining operations , 2013 .
[116] Snehamoy Chatterjee,et al. Open-pit coal mine production sequencing incorporating grade blending and stockpiling options: An application from an Indian mine , 2017 .
[117] Michel Gamache,et al. A shortest-path algorithm for solving the fleet management problem in underground mines , 2005, Eur. J. Oper. Res..
[118] C. Fricke,et al. Modeling the mining supply chain from mine to port: A combined optimization and simulation approach , 2011 .
[119] Chiun-Ming Liu,et al. A Blending and Inter-Modal Transportation Model for the Coal Distribution Problem , 2008 .
[120] Subhash C. Sarin,et al. The long-term mine production scheduling problem , 2005 .
[121] John Hadjigeorgiou,et al. Production scheduling optimization in open pit mines , 1993 .
[122] Andrés Weintraub,et al. A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models , 2008, Electron. Notes Discret. Math..
[123] Andreas T. Ernst,et al. Medium-Term Rail Scheduling for an Iron Ore Mining Company , 2014, Interfaces.
[124] Geraldo Robson Mateus,et al. Stochastic capacity planning and dynamic network design , 2013 .
[125] J. Picard. Maximal Closure of a Graph and Applications to Combinatorial Problems , 1976 .
[126] Roussos Dimitrakopoulos,et al. Optimising a Mineral Supply Chain Under Uncertainty with Long-Term Sales Contracts , 2018 .
[127] Andreas T. Ernst,et al. A mixed integer programming model for long term capacity expansion planning: A case study from The Hunter Valley Coal Chain , 2012, Eur. J. Oper. Res..
[128] Renaud Chicoisne,et al. A new algorithm for the open-pit mine scheduling problem , 2009 .
[129] Roussos G. Dimitrakopoulos,et al. Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions , 2014, Eur. J. Oper. Res..
[130] Mohammad Ataei,et al. Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits , 2003 .
[131] Erhan Kozan,et al. A demand-responsive decision support system for coal transportation , 2012, Decis. Support Syst..
[132] Erkan Topal,et al. Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .
[133] Amina Lamghari,et al. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..
[134] Robert Underwood,et al. A mathematical programming viewpoint for solving the ultimate pit problem , 1998, Eur. J. Oper. Res..
[135] Samuel Frimpong,et al. Optimising design parameters of continuous mining transport systems using discrete event simulation , 2016 .
[136] Jaap A. Ottjes,et al. Belt conveyor network design using simulation , 2016, J. Simulation.
[137] Louis Caccetta,et al. Application of Optimisation Techniques in Open Pit Mining , 2007 .
[138] Andreas Drexl,et al. Facility location models for distribution system design , 2005, Eur. J. Oper. Res..
[139] Marta Monteiro da Costa Cruz,et al. Simulation modelling of Vitória-Minas closed-loop rail network , 2015 .
[140] Mohammad Waqar Ali Asad,et al. Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand , 2013, J. Oper. Res. Soc..
[141] Mustafa Kumral,et al. Dig-limits optimization through mixed-integer linear programming in open-pit mines , 2018, J. Oper. Res. Soc..
[142] Gaurav Singh,et al. Distributed optimisation method for multi-resource constrained scheduling in coal supply chains , 2013 .
[143] Peter J. Stuckey,et al. Local Search for a Cargo Assembly Planning Problem , 2014, CPAIOR.
[144] Geraldo Robson Mateus,et al. Mathematical Models for Optimizing the Global Mining Supply Chain , 2010 .
[145] A. Newman,et al. Optimizing global thermal coal shipments , 2017 .
[146] Fabiano Mezadre Pompermayer,et al. Modelo integrado de apoio ao planejamento da rede de serviços no transporte ferroviário de cargas: aplicação para transporte de minério de ferro , 2010 .
[147] Nikos Vagenas,et al. Dispatch control of a fleet of remote-controlled/automatic load-haul-dump vehicles in underground mines , 1991 .
[148] Martin W. P. Savelsbergh,et al. Optimizing the Hunter Valley Coal Chain , 2012 .
[149] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[150] Atac Bascetin,et al. Optimization of shovel-truck system for surface mining , 2009 .
[151] Kadri Dagdelen,et al. Optimal blending of mine production using goal programming and interactive graphics systems , 1995 .
[152] Mohammad Waqar Ali Asad. Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation , 2007 .
[153] Xiaoqiang Cai,et al. A GENETIC ALGORITHM FOR RAILWAY SCHEDULING WITH ENVIRONMENTAL CONSIDERATIONS , 1997 .
[154] R. A. Halatchev. A model of discounted profit variation of open pit production sequencing optimization , 2005 .
[155] Roussos Dimitrakopoulos,et al. Schedule-based pushback design within the stochastic optimisation framework , 2018 .
[156] C. Fricke,et al. Combining Optimisation and Simulation to Model a Supply Chain from Pit to Port , 2018 .
[157] Mark Gershon,et al. Optimal mine production scheduling: evaluation of large scale mathematical programming approaches , 1983 .
[158] Mustafa Kumral. Optimal location of a mine facility by genetic algorithms , 2004 .
[159] M. Kumral. Application of chance-constrained programming based on multi-objective simulated annealing to solve a mineral blending problem , 2003 .
[160] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[161] Abbas Aghajani Bazzazi,et al. Cutoff grades optimization in open pit mines using meta-heuristic algorithms , 2019, Resources Policy.
[162] Robert Underwood,et al. A scheduling algorithm for open pit mines , 1996 .
[163] Martin W. P. Savelsbergh,et al. Improved stockyard management strategies for coal export terminal at Newcastle , 2011 .
[164] John Doucette,et al. A linear model for surface mining haul truck allocation incorporating shovel idle probabilities , 2013, Eur. J. Oper. Res..
[165] Saeid Nahavandi,et al. An effective heuristic for stockyard planning and machinery scheduling at a coal handling facility , 2013, 2013 11th IEEE International Conference on Industrial Informatics (INDIN).
[166] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[167] L. Díaz. Optimización de una red de transporte combinado para la exportación del carbón del interior de Colombia , 2011 .
[168] Ümit Sami Sakalli,et al. An optimization approach for brass casting blending problem under aletory and epistemic uncertainties , 2011 .
[169] Luis Montiel,et al. Optimizing mining complexes with multiple processing and transportation alternatives: An uncertainty-based approach , 2014, Eur. J. Oper. Res..
[170] Samuel R. Patterson,et al. Energy efficient scheduling of open-pit coal mine trucks , 2017, Eur. J. Oper. Res..
[171] Chen Ming,et al. Coal blending optimization of coal preparation production process based on improved GA , 2009 .
[172] Erhan Kozan,et al. Scheduling trains as a blocking parallel-machine job shop scheduling problem , 2009, Comput. Oper. Res..
[173] Gordon H. Huang,et al. Development of an inexact optimization model for coupled coal and power management in North China , 2009 .
[174] Erkan Topal,et al. A new mathematical programming model for production schedule optimization in underground mining operations , 2010 .
[175] Jian-ping Liu,et al. Open pit waste removal optimization through equipment fleet scheduling , 2017 .
[176] Martin W. P. Savelsbergh,et al. A stockyard planning problem , 2012, EURO J. Transp. Logist..
[177] Erkan Topal,et al. Mining truck scheduling with stochastic maintenance cost , 2012 .
[178] G. Tzeng,et al. Fuzzy bicriteria multi-index transportation problems for coal allocation planning of Taipower , 1996 .
[179] H. Sherali,et al. A coal shipping and blending problem for an electric utility company , 2000 .
[180] H. Askari-Nasab,et al. A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile , 2014 .
[181] Amina Lamghari,et al. Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty , 2014, Eur. J. Oper. Res..
[182] Marcelo Moretti Fioroni,et al. Simulation of continuous behavior using discrete tools: Ore conveyor transport , 2007, 2007 Winter Simulation Conference.
[183] J. Balzary,et al. Consideration for Multi-objective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to Market , 2018 .
[184] Andreas T. Ernst,et al. Medium-term rail planning at Rio Tinto Iron Ore , 2011 .
[185] E. Bakhtavar,et al. Development of a scenario-based robust model for the optimal truck-shovel allocation in open-pit mining , 2020, Comput. Oper. Res..
[186] R. Dimitrakopoulos,et al. A maximum upside / minimum downside approach to the traditional optimization of open pit mine design , 2007 .
[187] P. Alam. ‘L’ , 2021, Composites Engineering: An A–Z Guide.
[188] I. Dumitrescu,et al. A Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology , 2008 .
[189] Morteza Paricheh,et al. A simulation-based risk management approach to locating facilities in open-pit mines under price and grade uncertainties , 2018, Simul. Model. Pract. Theory.
[190] Andreas T. Ernst,et al. Integration of stockyard and rail network: a scheduling case study , 2004 .
[191] Francisco Saldanha-da-Gama,et al. Facility location and supply chain management - A review , 2009, Eur. J. Oper. Res..
[192] Gaurav Singh,et al. A resource constrained scheduling problem with multiple independent producers and a single linking constraint: A coal supply chain example , 2014, Eur. J. Oper. Res..
[193] Michel Gamache,et al. Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines , 2001 .
[194] Kjetil Fagerholt,et al. Optimal fleet design in a ship routing problem , 1999 .