Study on BIM-based construction project cost and schedule risk early warning
暂无分享,去创建一个
[1] Bon-Gang Hwang,et al. Risk management in small construction projects in Singapore: Status, barriers and impact , 2014 .
[2] Yiwang Wang,et al. Development and application of tender evaluation decision-making and risk early warning system for water projects based on KDD , 2012, Adv. Eng. Softw..
[3] Chabota Kaliba,et al. Cost escalation and schedule delays in road construction projects in Zambia , 2009 .
[4] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[5] Charles M. Eastman,et al. Benchmark tests for BIM data exchanges of precast concrete , 2009 .
[6] Aminah Robinson Fayek,et al. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP , 2010 .
[7] Andrew D.F. Price,et al. Modelling global risk factors affecting construction cost performance , 2003 .
[8] Daniel Henry,et al. Does size matter? Experiences and perspectives of BIM implementation from large and SME construction contractors , 2012 .
[9] Sagar K. Bhosekar,et al. Cost Controlling Using Earned Value Analysis in Construction Industries , 2012 .
[10] Usama H. Issa,et al. Implementation of lean construction techniques for minimizing the risks effect on project construction time , 2013 .
[11] Edmundas Kazimieras Zavadskas,et al. Risk assessment of construction projects , 2010 .
[12] V. M. Rao Tummala,et al. Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project , 1999 .
[13] Timo Hartmann,et al. Aligning building information model tools and construction management methods , 2012 .
[14] Zhen Chen,et al. Measuring the maturity of risk management in large-scale construction projects , 2013 .
[15] Steve Simister,et al. Usage and benefits of project risk analysis and management , 1994 .
[16] Hyeon-Seung Kim,et al. Development of 5D CAD System for Visualizing Risk Degree and Progress Schedule for Construction Project , 2011 .
[17] Gregory B. Vit. Competing logics: Project failure in Gaspesia , 2011 .
[19] Ricardo Jardim-Goncalves,et al. Value proposition on interoperability of BIM and collaborative working environments , 2010 .
[20] Zhen-Zhong Hu,et al. BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies , 2011 .
[21] Stephen O. Ogunlana,et al. Quantifying schedule risk in construction projects using Bayesian belief networks , 2009 .
[22] John F. Y. Yeung,et al. Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry , 2011 .
[23] Lieyun Ding,et al. Development of web-based system for safety risk early warning in urban metro construction , 2013 .
[24] Martin Fischer,et al. THE SCOPE AND ROLE OF INFORMATION TECHNOLOGY IN CONSTRUCTION , 2004 .