Power Quality Primer
暂无分享,去创建一个
[1] S. Sherr. Communications standards and the IEC , 1985 .
[2] B. Kennedy. Optimize placement of in-plant power-factor correction capacitors , 1995 .
[3] Alexander McEachern. Handbook of Power Signatures , 1988 .
[4] J. Billmann. Good power-quality service is achievable , 1995 .
[5] C. DeWinkel,et al. Storing power for critical loads , 1993, IEEE Spectrum.
[6] D. H. Cowling. CHECK FOR LIVE AC WIRES WITH THIS : ELECTROSTATIC VOLTAGE PROBE , 1998 .
[7] E. Downs,et al. A New Ball Game. , 1970 .
[8] J. Douglas. Power quality solutions , 1994, IEEE Power Engineering Review.
[9] E. H. Camm,et al. Solving customer power quality problems due to voltage magnification , 1998 .
[10] J. K. Phipps,et al. Power quality and harmonic distortion on distribution systems , 1991, [Proceedings] 1991 Rural Electric Power Conference. Papers presented at the 35th Annual Conference.
[11] W. L. Stebbins,et al. Power quality: a utility and industry perspective , 1997, 1997 IEEE Annual Textile, Fiber and Film Industry Technical Conference.
[12] F. J. Mercede,et al. A student design project to improve power quality for a commercial facility , 1995 .
[13] C. Sankaran. Power Quality , 2001 .
[14] Warren H. Lewis. Application of the National Electrical Code to the Installation of Sensitive Electronic Equipment , 1986, IEEE Transactions on Industry Applications.
[15] Jerry Whitaker. Power Quality Standards , 1998 .
[16] Joseph Carr Joseph J. Carr. Elements of Electronic Instrumentation and Measurement , 1986 .
[17] M. W. Marshall. What makes a power line vulnerable to lightning , 1996 .
[18] Jih-Sheng Lai,et al. Effectiveness of harmonic mitigation equipment for commercial office buildings , 1996 .
[19] B. Kennedy,et al. Use the Internet for power quality reporting , 1999 .
[20] G.S. Vassell,et al. Northeast Blackout of 1965 , 1990, IEEE Power Engineering Review.
[21] R. Rensi. Why transformer buyers must understand load-tap changers , 1995 .
[22] Steven J. DeRose. Standards update , 1995, LINK.
[23] Ernest W. Flick,et al. WESTINGHOUSE ELECTRIC CORP. , 1993 .
[24] J. Casazza. Blackouts : Is the risk increasing ? , 1998 .
[25] G. Baker,et al. Impact of fast tripping of utility breakers on industrial load interruptions , 1994, Proceedings of 1994 IEEE Industry Applications Society Annual Meeting.
[26] A. T. De Almeida. Understanding power quality , 1993 .
[27] Mark Johnson,et al. Power interruption costs to industrial and commercial consumers of electricity , 1996 .
[28] R. Dugan,et al. Using voltage sag and interruption indices in distribution planning , 1999, IEEE Power Engineering Society. 1999 Winter Meeting (Cat. No.99CH36233).
[29] G. T. Heydt,et al. Effects of electronic equipment on plant power quality , 1992 .
[30] P. D. Baumann. Superconducting magnetic energy storage: A key technology for the 21st century , 1993 .
[31] A. W. Kelley,et al. Adjustable speed drive for residential applications , 1995 .
[32] M. Samotyj,et al. Written-pole Revolution , 1997, IEEE Power Engineering Review.
[33] F. D. Martzloff,et al. Power quality site surveys: facts, fiction, and fallacies , 1988 .
[34] B. N. Suddeth,et al. Interruption costs, customer satisfaction and expectations for service reliability , 1996 .
[35] Muammar Qaddafi,et al. The Green Book , 1975 .
[36] Lawrence M. Thompson. Electrical Measurements and Calibration: Fundamentals and Applications , 1994 .
[37] E. L. Owen,et al. Power disturbance and quality: light flicker voltage requirements , 1996 .
[38] R. Bowden,et al. THE SPECTRUM OF SIMULATION SOFTWARE , 1998 .
[39] J. Miccinati,et al. Caveat emptor: Let the buyer beware! , 1978 .
[40] Electrotek Concepts.. Industrial Power Factor Analysis Guidebook. , 1995 .
[41] C. J. Mosbacher,et al. Use of Electrical and Electronic Instruments. , 1977 .
[42] Anthony J. Pansini. Electrical Transformers and Power Equipment , 1988 .
[43] T. S. Key,et al. Costs and benefits of harmonic current reduction for switch-mode power supplies in a commercial office building , 1995, IAS '95. Conference Record of the 1995 IEEE Industry Applications Conference Thirtieth IAS Annual Meeting.
[44] John Douglas. Solving problems of power quality , 1993 .
[45] James W. Nilsson,et al. Electric Circuits , 1983 .
[46] R. C. Dugan,et al. Predicting harmonic problems resulting from customer capacitor additions for demand-side management , 1995 .
[47] Gerald Luecke,et al. Basic AC Circuits , 1986 .
[48] J. Reason. Live-fire fault test of SVC: a lesson in power quality , 1995 .