Palmer-based flexible flow-shop scheduling for continuous fuzzy domains
暂无分享,去创建一个
Tzung-Pei Hong | Shyue-Liang Wang | Tzu-Ting Wang | T. Hong | Tzu-Ting Wang | Shyue-Liang Wang | T. Hong | Tzung-Pei Hong
[1] Igor Gazdik. Fuzzy-Network Planning - FNET , 1983, IEEE Transactions on Reliability.
[2] Tzung-Pei Hong,et al. Fuzzy palmer Scheduling for Flow Shops with More than Two Machines , 1999, J. Inf. Sci. Eng..
[3] Antonio González. A study of the ranking function approach through mean values , 1990 .
[4] Glenn Shafer,et al. Implementing Dempster's Rule for Hierarchical Evidence , 1987, Artif. Intell..
[5] Hiroaki Ishii,et al. One machine scheduling problem with fuzzy duedates , 1994 .
[6] Tzung-Pei Hong,et al. Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains , 2000, Information Sciences.
[7] Ronald R. Yager,et al. A procedure for ordering fuzzy subsets of the unit interval , 1981, Inf. Sci..
[8] M. Vila,et al. A procedure for ranking fuzzy numbers using fuzzy relations , 1988 .
[9] Shi-Chung Chang,et al. Scheduling flexible flow shops with no setup effects , 1992, Proceedings 1992 IEEE International Conference on Robotics and Automation.
[10] E.Stanley Lee,et al. Fuzzy job sequencing for a flow shop , 1992 .
[11] Tzung-Pei Hong,et al. LPT scheduling for fuzzy tasks , 1998, Fuzzy Sets Syst..
[12] J. Buckley,et al. A fast method of ranking alternatives using fuzzy numbers , 1989 .
[13] J. Buckley. The multiple judge, multiple criteria ranking problem: A fuzzy set approach , 1984 .
[14] Tzung-Pei Hong,et al. A new triangular fuzzy Johnson algorithm , 1999 .
[15] Stefan Chanas,et al. Integer flows in network with fuzzy capacity constraints , 1986, Networks.
[16] Chelliah Sriskandarajah,et al. Scheduling algorithms for flexible flowshops: Worst and average case performance , 1988 .
[17] E. Lee,et al. Project network analysis with fuzzy activity times , 1988 .
[18] S. H. Nasution. Fuzzy Critical Path Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..
[19] L. M. D. C. Ibáñez,et al. A subjective approach for ranking fuzzy numbers , 1989 .
[20] Tzung-Pei Hong,et al. Fuzzy Flexible-Flow Shops at Two Machine Centers , 1998, J. Adv. Comput. Intell. Intell. Informatics.
[21] Mitsuo Gen,et al. An efficient approach for large scale project planning based on fuzzy Delphi method , 1995, Fuzzy Sets Syst..
[22] Edward H. Shortliffe,et al. Rule Based Expert Systems: The Mycin Experiments of the Stanford Heuristic Programming Project (The Addison-Wesley series in artificial intelligence) , 1984 .
[23] Shi-Chung Chang,et al. Scheduling flexible flow shops with no setup effects , 1994, IEEE Trans. Robotics Autom..
[24] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[25] J. Buckley. Ranking alternatives using fuzzy numbers , 1985 .
[26] S. Chanas,et al. Real-valued flows in a network with fuzzy arc capacities , 1984 .