Sequential Scheduling Method for FJSP with Multi-Objective under Mixed Work Calendars
暂无分享,去创建一个
[1] Liang Gao,et al. A shuffled multi-swarm micro-migrating birds optimizer for a multi-resource-constrained flexible job shop scheduling problem , 2016, Inf. Sci..
[2] Marco Laumanns,et al. SPEA2: Improving the strength pareto evolutionary algorithm , 2001 .
[3] Osman Kulak,et al. Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem , 2016, Comput. Ind. Eng..
[4] Qihuan Huang,et al. Integration of InSAR and GPS for hydraulic engineering , 2007 .
[5] Julia Rieck,et al. Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars , 2016, Eur. J. Oper. Res..
[6] Mehrdad Amirghasemi,et al. An effective asexual genetic algorithm for solving the job shop scheduling problem , 2015, Comput. Ind. Eng..
[7] Abdelghani Bekrar,et al. An Iterative Greedy Insertion Technique for Flexible Job Shop Scheduling Problem , 2016 .
[8] Lothar Thiele,et al. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..