Value engineering in public construction projects in Saudi Arabia

It was found that value engineering was in limited use since it has been introduced in 1981. The main reason for the lack of adoption being unfamiliarity with the concept among public sector organizations, as well as local architectural/engineering firms in the Kingdom.