A Systematic Cycle Time Reduction Procedure for Enhancing the Competitiveness and Sustainability of a Semiconductor Manufacturer

Cycle time reduction plays an important role in improving the competitiveness and sustainability of a semiconductor manufacturer. However, in the past, cycle time reduction was usually unplanned owing to the lack of a systematic and quantitative procedure. To tackle this problem, a systematic procedure was established in this study for planning cycle time reduction actions to enhance the competitiveness and sustainability of a semiconductor manufacturer. First, some controllable factors that are influential to the job cycle time are identified. Subsequently, the relationship between the controllable factors and the job cycle time is fitted with a back propagation network. Based on this relationship, actions to shorten the job cycle time can be planned. The feasibility and effectiveness of an action have to be assessed before it can be taken in practice. An example containing the real data of hundreds of jobs has been used to illustrate the applicability of the proposed methodology. In addition, the financial benefits of the cycle time reduction action were analyzed, which provided the evidence that the proposed methodology enabled the sustainable development of the semiconductor manufacturer, since capital adequacy is very important in the semiconductor manufacturing industry.

[1]  Shu-Hsien Liao,et al.  Knowledge transfer and competitive advantage on environmental uncertainty: An empirical study of the Taiwan semiconductor industry , 2007 .

[2]  Tyson R. Browning,et al.  Use of Dependency Structure Matrices for Product Development Cycle Time Reduction , 1998 .

[3]  Hsin-Chieh Wu,et al.  A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory-a simulation study , 2009 .

[4]  Toly Chen A flexible way of modeling the long-term cost competitiveness of a semiconductor product , 2013 .

[5]  Mansooreh Mollaghasemi,et al.  A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility--a case study , 2006 .

[6]  Robert C. Leachman,et al.  Competitive Semiconductor Manufacturing : Final Report on Findings from Benchmarking Eight-inch , sub-350 nm Wafer Fabrication Lines , 2002 .

[7]  Toly Chen,et al.  An optimized tailored nonlinear fluctuation smoothing rule for scheduling a semiconductor manufacturing factory , 2010, Comput. Ind. Eng..

[8]  Takayuki Ito,et al.  A Middle-Agent Framework Focused on the Role of Distributors , 2012, J. Inf. Process..

[9]  Toly Chen,et al.  Lot cycle time prediction in a ramping-up semiconductor manufacturing factory with a SOM–FBPN-ensemble approach with multiple buckets and partial normalization , 2009 .

[10]  Chen-Fu Chien,et al.  Mini–max regret strategy for robust capacity expansion decisions in semiconductor manufacturing , 2012, J. Intell. Manuf..

[11]  John N. Pearson,et al.  The role of purchasing/transportation in cycle time reduction , 1997 .

[12]  Toly Chen,et al.  A Hybrid SOM-BPN Approach to Lot Output Time Prediction in a Wafer Fab , 2006, Neural Processing Letters.

[13]  Rashedur M. Rahman,et al.  Bangla User Adaptive Word Speech Recognition: Approaches and Comparisons , 2013, Int. J. Fuzzy Syst. Appl..

[14]  Chen-Fu Chien,et al.  Data value development to enhance competitive advantage: a retrospective study of EDA systems for semiconductor fabrication , 2003, Int. J. Serv. Technol. Manag..

[15]  Lawrence M. Wein,et al.  On the relationship between yield and cycle time in semiconductor wafer fabrication , 1992 .

[16]  E. Armstrong Principles for competitive semiconductor manufacturing , 1989, IEEE/SEMI International Semiconductor Manufacturing Science Symposium.

[17]  Jih-Chang Hsieh,et al.  A neural networks approach for due-date assignment in a wafer fabrication factory , 2003 .

[18]  Michael Pinedo,et al.  Sequencing in an Assembly Line with Blocking to Minimize Cycle Time , 1989, Oper. Res..

[19]  T Chen Establishing the optimal and efficient capacity re-allocation plans for enhancing the long-term competitiveness of a semiconductor product — a long-term trend viewpoint , 2010 .

[20]  David A. Anderson,et al.  The Cost of Crime , 2012, Found. Trends Microeconomics.

[21]  S.C.H. Lu,et al.  Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants , 1994 .

[22]  Toly Chen A fuzzy back propagation network for output time prediction in a wafer fab , 2003, Appl. Soft Comput..

[23]  Vaibhav Gupta,et al.  Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .

[24]  A simulation evaluation of backward elimination and stepwise variable selection in regression analysis , 2012 .

[25]  Chen-Fu Chien,et al.  Manufacturing intelligence to forecast and reduce semiconductor cycle time , 2012, J. Intell. Manuf..

[26]  T Chen Fuzzy-neural-network-based fluctuation smoothing rule for reducing the cycle times of jobs with various priorities in a wafer fabrication plant: A simulation study , 2009 .

[27]  Toly Chen,et al.  An Iterative Procedure for Optimizing the Performance of the Fuzzy-Neural Job Cycle Time Estimation Approach in a Wafer Fabrication Factory , 2013 .

[28]  Steven T. Walsh,et al.  The semiconductor silicon industry roadmap: Epochs driven by the dynamics between disruptive technologies and core competencies , 2005 .