Performance Related Information-Based Operating Performance Assessment of Multiphase Batch Processes
暂无分享,去创建一个
[1] Donghua Zhou,et al. Total projection to latent structures for process monitoring , 2009 .
[2] Fuli Wang,et al. Online process operating performance assessment and nonoptimal cause identification for industrial processes , 2014 .
[3] Fuli Wang,et al. Operating optimality assessment and nonoptimal cause identification for non-Gaussian multimode processes with transitions , 2015 .
[4] Zhengshun Fei,et al. Online Probabilistic Assessment of Operating Performance Based on Safety and Optimality Indices for Multimode Industrial Processes , 2009 .
[5] S. D. Jong. SIMPLS: an alternative approach to partial least squares regression , 1993 .
[6] Fuli Wang,et al. Process operating performance optimality assessment with coexistence of quantitative and qualitative information , 2018 .
[7] Gülnur Birol,et al. A modular simulation package for fed-batch fermentation: penicillin production , 2002 .
[8] Fuli Wang,et al. Process operating performance optimality assessment and non-optimal cause identification under uncertainties , 2017 .
[9] Fuli Wang,et al. Multiple Hypotheses Testing-Based Operating Optimality Assessment and Nonoptimal Cause Identification for Multiphase Uneven-Length Batch Processes , 2016 .
[10] Fuli Wang,et al. Operating optimality assessment based on optimality related variations and nonoptimal cause identification for industrial processes , 2016 .
[11] S. J. Parulekar,et al. A morphologically structured model for penicillin production , 2002, Biotechnology and bioengineering.
[12] Fuli Wang,et al. Operating optimality assessment and cause identification for nonlinear industrial processes , 2017 .