Technology Acceptance: Malaysian Industrialised Building System (IBS) Case
暂无分享,去创建一个
Angela Lee | Siti Halipah Ibrahim | Azree Othuman Mydin | Mohd Nasrun Mohd Nawi | Ahmed Mohammed Kamaruddeen
[1] S. Brearley,et al. Introducing Focus Groups , 2019, Basic and Advanced Focus Groups.
[2] A. A. M. Bohari,et al. Industrialised Building System (IBS) in Sarawak construction industry , 2012, 2012 International Conference on Innovation Management and Technology Research.
[3] Angela Lee,et al. Fragmentation issue in Malaysian industrialised building system (IBS) projects , 2014 .
[4] Angela Lee,et al. A critical literature review on the concept of team integration in Industrialised Building System (IBS) project , 2011 .
[5] K. A. M. Kamar,et al. Industrialised Building System (IBS) construction: Measuring the perception of contractors in Malaysia , 2012, 2012 IEEE Business, Engineering & Industrial Applications Colloquium (BEIAC).
[6] Mohd Sapuan Salit,et al. The essential characteristics of industrialised building system , 2003 .
[7] J. Kitzinger,et al. Qualitative Research: Introducing focus groups , 1995 .
[8] Angela Lee,et al. Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case , 2012 .