Economic ordering policy for an item with imperfect quality subject to the in-house inspection
暂无分享,去创建一个
[1] S. Papachristos,et al. Economic ordering quantity models for items with imperfect quality , 2006 .
[2] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[3] L. Cárdenas-Barrón,et al. Note on: Economic production quantity model for items with imperfect quality – a practical approach , 2002 .
[4] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[5] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[6] Chih-Hsiung Wang. Integrated production and product inspection policy for a deteriorating production system , 2005 .
[7] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[8] R L Schwaller. EOQ UNDER INSPECTION COSTS , 1988 .
[9] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[10] W. M. Chan,et al. A new EPQ model: integrating lower pricing, rework and reject situations , 2003 .
[11] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[12] Ping Yang,et al. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .
[13] Shey-Huei Sheu,et al. Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system , 2001, Comput. Oper. Res..
[14] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[15] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .