The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints
暂无分享,去创建一个
[1] Carlos F. Daganzo,et al. A branch and bound solution method for the crane scheduling problem , 1990 .
[2] Kees Jan Roodbergen,et al. Seaside operations in container terminals: literature overview, trends, and research directions , 2015 .
[3] Ali H. Diabat,et al. A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints , 2017, Ann. Oper. Res..
[4] M. Flavia Monaco,et al. Quay crane scheduling with time windows, one-way and spatial constraints , 2011 .
[5] Carlos F. Daganzo,et al. THE CRANE SCHEDULING PROBLEM , 1989 .
[6] Lixin Miao,et al. Quay crane scheduling with non-interference constraints in port container terminals , 2008 .
[7] Reza Tavakkoli-Moghaddam,et al. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports , 2009, Comput. Ind. Eng..
[8] Gilbert Laporte,et al. A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal , 2006 .
[9] Christian Bierwirth,et al. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals , 2015, Eur. J. Oper. Res..
[10] G. Nemhauser,et al. Integer Programming , 2020 .
[11] Christian Bierwirth,et al. A unified approach for the evaluation of quay crane scheduling models and algorithms , 2011, Comput. Oper. Res..
[12] Christian Bierwirth,et al. A fast heuristic for quay crane scheduling with interference constraints , 2009, J. Sched..
[13] Lilach Nachum,et al. UNCTAD's World Investment Report 2002: Transnational Corporations and Export Competitiveness, United Nations, Geneva and New York 2002 , 2003 .
[14] Nathan Huynh,et al. An efficient genetic algorithm for solving the quay crane scheduling problem , 2012, Expert Syst. Appl..
[15] Pasquale Legato,et al. Modeling and solving rich quay crane scheduling problems , 2012, Comput. Oper. Res..
[16] Lei Wang,et al. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures , 2006 .
[17] Y. Zhu,et al. Crane scheduling with non-crossing constraint , 2006, J. Oper. Res. Soc..
[18] Yuanbin Song,et al. Optimization of Quay Crane Scheduling Constrained by Stability of Vessels , 2013 .
[19] Ali Diabat,et al. A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem , 2015 .
[20] Yongpei Guan,et al. The crane scheduling problem: models and solution approaches , 2013, Ann. Oper. Res..
[21] Frank Meisel,et al. The quay crane scheduling problem with time windows , 2011 .
[22] Yi Zhu,et al. Crane scheduling with spatial constraints , 2004 .
[23] Ali H. Diabat,et al. A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty , 2016, Simul. Model. Pract. Theory.
[24] Zhiqiang Lu,et al. A heuristic for the quay crane scheduling problem based on contiguous bay crane operations , 2012, Comput. Oper. Res..
[25] Yi Wang,et al. A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints , 2012, 1210.6896.
[26] Ali Diabat,et al. The Quay Crane Scheduling Problem , 2015 .
[27] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[28] Sai Ho Chung,et al. A modified genetic algorithm for quay crane scheduling operations , 2012, Expert Syst. Appl..
[29] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..
[30] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[31] Ali H. Diabat,et al. A joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational results , 2015, Optim. Lett..
[32] Andrew Lim,et al. A m‐parallel crane scheduling problem with a non‐crossing constraint , 2007 .
[33] Ali H. Diabat,et al. A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach , 2014, Expert Syst. Appl..
[34] M. F. Monaco,et al. A tabu search heuristic for the quay crane scheduling problem , 2007 .
[35] Ali H. Diabat,et al. An Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price , 2014, 2016 International Conference on Computational Science and Computational Intelligence (CSCI).