Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
暂无分享,去创建一个
[1] Singa Wang Chiu,et al. Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown , 2009 .
[2] Mordecai Avriel,et al. Nonlinear programming , 1976 .
[3] A. Seidmann,et al. Production lot sizing with machine breakdowns , 1992 .
[4] Yuan-Shyi Peter Chiu,et al. Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..
[5] Ferhan Merdivenci Atici,et al. A production-inventory model of HMMS on time scales , 2008, Appl. Math. Lett..
[6] Singa Wang Chiu,et al. Robust planning in optimization for production system subject to random machine breakdown and failure in rework , 2010, Comput. Oper. Res..
[7] Hong-Dar Lin,et al. Note on "replenishment run time problem with machine breakdown and failure in rework" , 2012, Expert Syst. Appl..
[8] Yuan-Shyi Peter Chiu,et al. Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework , 2010, Appl. Math. Lett..
[9] Singa Wang Chiu,et al. An optimization problem of manufacturing systems with stochastic machine breakdown and rework process , 2008 .
[10] Yuan-Shyi Peter Chiu,et al. Replenishment run time problem with machine breakdown and failure in rework , 2012, Expert Syst. Appl..
[11] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[12] R. J. Tersine. Principles of inventory and materials management , 1982 .
[13] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .