Minimizing makespan in a single-machine scheduling problem with a learning effect and fuzzy processing times
暂无分享,去创建一个
[1] Gur Mosheiov,et al. Scheduling with general job-dependent learning curves , 2003, Eur. J. Oper. Res..
[2] A. Charnes,et al. Chance-Constrained Programming , 1959 .
[3] D. B. Montgomery,et al. Diagnosing the Experience Curve , 1983 .
[4] G. Bortolan,et al. A review of some methods for ranking fuzzy subsets , 1985 .
[5] Didier Dubois,et al. Readings in Fuzzy Sets for Intelligent Systems , 1993 .
[6] Fardin Ahmadizar,et al. Application of chance-constrained programming for stochastic group shop scheduling problem , 2009 .
[7] Dar-Li Yang,et al. Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect , 2006, Eur. J. Oper. Res..
[8] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[9] Saeid Abbasbandy,et al. A new approach for ranking of trapezoidal fuzzy numbers , 2009, Comput. Math. Appl..
[10] S. Chanas,et al. Single value simulation of fuzzy variables , 1988 .
[11] Dar-Li Yang,et al. Minimizing the makespan in a single machine scheduling problem with a time-based learning effect , 2006, Inf. Process. Lett..
[12] Masatoshi Sakawa,et al. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..
[13] Guoqing Wang,et al. Single Machine Scheduling with Learning Effect Considerations , 2000, Ann. Oper. Res..
[14] Fardin Ahmadizar,et al. Single-machine scheduling with a position-based learning effect and fuzzy processing times , 2011 .
[15] A. Kaufmann,et al. Introduction to fuzzy arithmetic : theory and applications , 1986 .
[16] Dingwei Wang,et al. The single machine ready time scheduling problem with fuzzy processing times , 2002, Fuzzy Sets Syst..
[17] Gur Mosheiov,et al. Scheduling problems with a learning effect , 2001, Eur. J. Oper. Res..
[18] Dar-Li Yang,et al. Single-machine group scheduling with a time-dependent learning effect , 2006, Comput. Oper. Res..
[19] I. Kuban Altinel,et al. Scheduling of batch processes with operational uncertainties , 1996 .
[20] Yian-Kui Liu,et al. Expected value of fuzzy variable and fuzzy expected value models , 2002, IEEE Trans. Fuzzy Syst..
[21] Dehua Xu,et al. Single-machine scheduling with a general sum-of-actual-processing-times-based and job-position-based learning effect , 2010 .
[22] T. C. Edwin Cheng,et al. Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects , 2008, Inf. Sci..
[23] Caroline M. Eastman,et al. Response: Introduction to fuzzy arithmetic: Theory and applications : Arnold Kaufmann and Madan M. Gupta, Van Nostrand Reinhold, New York, 1985 , 1987, Int. J. Approx. Reason..
[24] Wen-Chiung Lee,et al. Single-machine scheduling problems with a learning effect , 2008 .
[25] T. Chu,et al. Ranking fuzzy numbers with an area between the centroid point and original point , 2002 .
[26] G. Kent Webb,et al. Integrated circuit (IC) pricing , 1994 .
[27] James C. Bezdek,et al. Analysis of fuzzy information , 1987 .
[28] T. P. Wright,et al. Factors affecting the cost of airplanes , 1936 .