Optimizing mining complexes with multiple processing and transportation alternatives: An uncertainty-based approach
暂无分享,去创建一个
[1] Roussos Dimitrakopoulos,et al. Stochastic mine production scheduling with multiple processes: Application at Escondida Norte, Chile , 2013, Journal of Mining Science.
[2] Roussos Dimitrakopoulos,et al. Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines , 2013 .
[3] Jan J. Cilliers,et al. Recovery vs. mass pull: The link to air recovery , 2010 .
[4] R. Dimitrakopoulos,et al. Managing risk and waste mining in long-term production scheduling of open-pit mines , 2004 .
[5] R. Dimitrakopoulos,et al. Uncertainty-based production scheduling in open pit mining , 2004 .
[6] Amina Lamghari,et al. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..
[7] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[8] Salih Ramazan,et al. Production scheduling with uncertain supply: a new solution to the open pit mining problem , 2013 .
[9] Patricia W. Rader. Not for the faint‐hearted , 1999 .
[10] R. Dimitrakopoulos,et al. Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis , 2009 .
[11] J. Benndorf,et al. Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty , 2013, Journal of Mining Science.
[12] Ulrich Faigle,et al. Computational Complexity of Some Maximum Average Weight Problems with Precedence Constraints , 1994, Oper. Res..
[13] R Dimitrakopoulos,et al. Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mine , 2013 .
[14] Marcelo Godoy,et al. The effective management of geological risk in long-term production scheduling of open pit mines , 2003 .
[15] Alexandre Boucher,et al. Applied Geostatistics with SGeMS: A User's Guide , 2009 .
[16] N. Metropolis,et al. Equation of State Calculations by Fast Computing Machines , 1953, Resonance.
[17] Xavier Emery,et al. Joint Simulation of Grade and Rock Type in a Stratabound Copper Deposit , 2015, Mathematical Geosciences.
[18] Roussos Dimitrakopoulos,et al. Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit , 2007 .
[19] S. Hoerger,et al. MINE PLANNING AT NEWMONT'S NEVADA OPERATIONS , 1999 .
[20] Amina Lamghari,et al. A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty , 2014, J. Oper. Res. Soc..