Determination of the optimum cut-off grades and production scheduling in multi-product open pit mines using imperialist competitive algorithm (ICA)

With regard to the immense importance of cut-off grade in designing and planning open pit mines, optimizing this parameter has considerable effects in mining economic. This paper describes objective function for single metal mines with multi-product. For this purpose, the operation process in mine No.1 of the Golgohar iron mine that produces three types of products (sizing, concentrate and pellet) for sales is used to model objective function. Then the Imperialist Competitive Algorithm (ICA) has been utilized to find out the optimum cut-off grades. Consequently, the optimum cut-off grades has been calculated between 40.5 and 47.5% and net present value has been obtained 18,142 billion Rial. In addition, production scheduling is carried out for five years mining plan pushback. Therefore, the average stripping ratio has been determined 1.41. The result shows that by stockpiling low-grade ore, concentrate plant can be fed by maximum capacity for one year addition to the primary plan.

[1]  A. Bascetin A. Nieto Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor , 2007 .

[2]  Mohammad Anemangely,et al.  Optimal cut-off grade determination based on variable capacities in open-pit mining , 2012 .

[3]  Mohammad Ataei,et al.  Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits , 2003 .

[4]  Erkan Topal,et al.  Net present value maximization model for optimum cut-off grade policy of open pit mining operations , 2011 .

[5]  Singiresu S. Rao Engineering Optimization : Theory and Practice , 2010 .

[6]  Kenneth F. Lane,et al.  The Economic Definition of Ore: Cut-off Grades in Theory and Practice , 1988 .

[7]  Hasan Ghasemzadeh,et al.  A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects , 2015 .

[8]  Mohammad Waqar Ali Asad Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals , 2005 .

[9]  Ahmad Asadi,et al.  Determination of optimised cut-off grade utilising non-linear programming , 2015, Arabian Journal of Geosciences.

[10]  W. Hustrulid,et al.  Open Pit Mine Planning and Design , 2015 .

[11]  Akbar Esfahanipour,et al.  An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection , 2013 .

[12]  Bahram Rezai,et al.  An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage , 2008 .

[13]  Mohammad Ataei,et al.  Determination of optimum cutoff grades of multiple metal deposits by using the Golden Section search method , 2003 .

[14]  Caro Lucas,et al.  Imperialist competitive algorithm: An algorithm for optimization inspired by imperialistic competition , 2007, 2007 IEEE Congress on Evolutionary Computation.

[15]  Matt Thompson,et al.  Cut-off grade: A real options analysis , 2014 .

[16]  Drew Barr Stochastic Dynamic Optimization of Cut-off Grade in Open Pit Mines , 2012 .