REMOVING HIDDEN WAITING TIME IN CRITICAL PATH SCHEDULES: A LOCATION-BASED APPROACH TO AVOIDING WASTE
暂无分享,去创建一个
[1] Gregory A. Howell,et al. Capacity Utilization and Wait Time: A Primer for Construction , 2001 .
[2] Tariq S. Abdelhamid,et al. Analyzing the Relationship Between Production Constraints and Construction Work Flow Reliability: An SEM Approach , 2010 .
[3] Luiz Fernando Mählmann Heineck,et al. Data Envelopment Analysis and the Quest for Targets – a Case Study in Connection to Waste Reduction on Site , 2014 .
[4] Trond Bølviken. 10 Statements on Production and Construction Theory , 2006 .
[5] Russell Kenley. Dispelling the Complexity Myth: Founding Lean Construction on Location-based Planning , 2005 .
[6] Burcu Akinci,et al. Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts , 1998 .
[7] Sven Bertelsen,et al. Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.
[8] Søren Wandahl,et al. The robust schedule - a link to improved workflow , 2012 .
[9] Olli Seppänen,et al. Location-Based Management for Construction: Planning, scheduling and control , 2006 .
[10] Lauri Koskela,et al. Which are the wastes of construction , 2013 .
[11] Bo Terje Kalsaas. WORK-TIME WASTE IN CONSTRUCTION , 2010 .
[12] Vicente González,et al. A Production Model for Construction: A Theoretical Framework , 2015 .
[13] Lauri Koskela,et al. The Wastes of Production in Construction – a TFV Based Taxonomy , 2014 .
[14] Patricia D. Galloway,et al. Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects , 2006 .
[15] Russell Kenley. The predictive ability of Bromilow's timecost model: a comment , 2001 .
[16] Glenn Ballard,et al. The Combination of Last Planner System and Location-Based Management System , 2010 .
[17] Russell Kenley,et al. Project Micro-Management: Practical Site Planning and Management of Work Flow , 2004 .