Effect of scrapping on the performance of multistage automatic transfer lines
暂无分享,去创建一个
[1] Kenjiro Okamura,et al. Analysis of the Effect of Buffer Storage Capacity in Transfer Line Systems , 1977 .
[2] Stanley B. Gershwin,et al. Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers , 1983, Oper. Res..
[3] J. G. Shanthikumar. On the Production Capacity of Automatic Transfer Lines with Unlimited Buffer Space , 1980 .
[4] J. George Shanthikumar,et al. An Approximate Model of Multistage Automatic Transfer Lines with Possible Scrapping Of Workpieces , 1987 .
[5] Jr. Mikell P. Groover. Automation, production systems, and computer-aided manufacturing , 1980 .
[6] J. G. Shanthikumar,et al. An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units , 1983 .