Linear physical programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
暂无分享,去创建一个
[1] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[2] Surendra M. Gupta,et al. A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS , 2002 .
[3] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[4] Surendra M. Gupta,et al. Multi-criteria decision making approach in multiple periods for a disassembly-to-order system under product's deterioration and stochastic yields , 2005, SPIE Optics East.
[5] Karl Inderfurth,et al. Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..
[6] Surendra M. Gupta,et al. Calculating disassembly yields in a multi-criteria decision-making environment for a disassembly-to-order system , 2006 .
[7] Surendra M. Gupta,et al. Evolutionary computation with linear physical programming for solving a disassembly-to-order system , 2006, SPIE Optics East.
[8] Amre Z. Massoud,et al. Solving the Multi-Period Disassembly-to-Order System Under Stochastic Yields, Limited Supply, and Quantity Discount , 2008 .
[9] Surendra M. Gupta,et al. Solving the disassembly-to-order problem using linear physical programming , 2009, Int. J. Math. Oper. Res..