A Fuzzy MCDM for Evaluating Risk of Construction Projects

Construction projects deal with various threats which are called risks. If we do not have good strategies to identify and perform preventive actions for these threats, the project may fail. In the risk management process, contractors are faced by some unintelligible problems such as cultural problems, fundamental problems and changing of policies. If we want to succeed in project we should identify, analyze, manage and control the risks. These tasks must be implemented by contractors. A project must complete in predetermined time and quality according to limited budget. Therefore the risk management of project is very important to succeed in project. One of the most important steps in risk management process is identifying risk factors of a project. In this study, the important risk factors are categorized into two main groups as internal factors and external factors. Each main group consists of several factors. A prevalent problem that is investigated by researchers in project risk management is specifying risks of threats to which the project is exposed. For evaluating the risk of threats, we rank them in terms of their probability and severity. In this study risk evaluation of construction project is investigated by the proposed fuzzy analytical hierarchy process (FAHP). The risk factors are prioritized by using analytical hierarchy process. For illustrating the FAHP method, a case study is presented.

[1]  Madan M. Gupta,et al.  Fuzzy mathematical models in engineering and management science , 1988 .

[2]  T. Saaty Axiomatic foundation of the analytic hierarchy process , 1986 .

[3]  Eugene D. Hahn Decision Making with Uncertain Judgments: A Stochastic Formulation of the Analytic Hierarchy Process , 2003, Decis. Sci..

[4]  Chris Chapman,et al.  Risk analysis: Testing some prejudices , 1983 .

[5]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[6]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[7]  V. M. Rao Tummala,et al.  Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project , 1999 .

[8]  Mao-Jiun J. Wang,et al.  Ranking fuzzy numbers with integral value , 1992 .

[9]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[10]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[11]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[12]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[13]  Amiruddin Ismail,et al.  Approach to analyze risk factors for construction projects utilizing fuzzy logic , 2008 .

[14]  David B. Ashley,et al.  Political Risks in International Construction , 1987 .

[15]  H. Iranmanesh,et al.  Risk Evaluation of Information Technology Projects Based on Fuzzy Analytic Hierarchal Process , 2008 .

[16]  Ming-Teh Wang,et al.  Risk Allocation and Risk Handling of Highway Projects in Taiwan , 2003 .

[17]  Chris Hendrickson,et al.  EXCHANGE RATE RISK MANAGEMENT IN INTERNATIONAL CONSTRUCTION VENTURES , 2001 .

[18]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[19]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[20]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[21]  J. Perry,et al.  RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .

[22]  Prasanta Kumar Dey Process re-engineering for effective implementation of projects , 1999 .

[23]  J. Rodney Turner,et al.  THE HANDBOOK OF PROJECT-BASED MANAGEMENT , 2008 .