The impact of two-product joint lifecycles on capacity planning of remanufacturing networks

Capacity planning in the reverse channel of closed-loop supply chains (CLSCs) involves complex issues due to the different lifecycles of product offerings in combination with the variability regarding product usage time, quality level of used products and return patterns. (Georgiadis, P., Vlachos, D., Tagaras, G., 2006. The impact of product lifecycle on capacity planning of closed-loop supply chains with remanufacturing. Production and Operations Management 15; 514-527) developed a system dynamics (SD) model to study a CLSC with remanufacturing for a single product which incorporates a dynamic capacity modeling approach. We extend this SD model for two sequential product-types under two alternative scenarios regarding the market preferences over the product-types; in the first scenario, the market is considered showing no preferences, while in the second scenario, the demand over a product-type can be satisfied only by providing units of the specific type. We study how the joint lifecycles of two product-types, entry time of the second product-type to the market and used product return patterns affect the optimal policies regarding expansion and contraction of collection and remanufacturing capacities. The results of extensive numerical investigation are tested for their statistical significance using analysis of variance (ANOVA). In the first scenario, the results show that the system performs best when the two lifecycles form a trapezoid pattern for total demand while in the second scenario, when the two lifecycles form a triangular pattern.

[1]  John D. Sterman,et al.  Business dynamics : systems thinking and modelling for acomplex world , 2002 .

[2]  Jun Zhang,et al.  Special Section: Closed-Loop Supply Chains: Practice and Potential: Reconfiguring a Remanufacturing Line at Visteon, Mexico , 2003, Interfaces.

[3]  Baptiste Lebreton,et al.  A quantitative approach to assessing the profitability of car and truck tire remanufacturing , 2006 .

[4]  L. B. Toktay,et al.  Joint Life‐Cycle Dynamics of New and Remanufactured Products , 2006 .

[5]  R. Dekker,et al.  Reverse logistics : quantitative models for closed-loop supply chains , 2004 .

[6]  Patroklos Georgiadis,et al.  The effect of environmental parameters on product recovery , 2004, Eur. J. Oper. Res..

[7]  Konstantin Kogan,et al.  An optimal control method for aggregate production planning in large-scale manufacturing systems with capacity expansion and deterioration , 1995 .

[8]  Shigenori Sakurai,et al.  Recent Progress in Closing the Loop of Automobile Recyclability - Japan , 1992 .

[9]  Rudolf Kruse,et al.  Neuro-fuzzy approach to forecast returns of scrapped products to recycling and remanufacturing , 2002, Knowl. Based Syst..

[10]  Patroklos Georgiadis,et al.  The Impact of Product Lifecycle on Capacity Planning of Closed‐Loop Supply Chains with Remanufacturing , 2006 .

[11]  M. S. Spencer,et al.  An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .

[12]  Yun-Hi Kim,et al.  An integrated approach to dynamic plant location and capacity planning , 1999, J. Oper. Res. Soc..

[13]  Otto Rentz,et al.  Special Section: Closed-Loop Supply Chains: Practice and Potential: Closed-Loop Supply Chains for Spent Batteries , 2003, Interfaces.

[14]  Patroklos Georgiadis,et al.  Production , Manufacturing and Logistics Real-time production planning and control system for job-shop manufacturing : A system dynamics analysis , 2011 .

[15]  Surendra M. Gupta,et al.  Capacity and buffer trade-offs in a remanufacturing system , 2002, Optics East.

[16]  P. C. Schuur,et al.  Business case Océ: Reverse logistic network re-design for copiers , 1999 .

[17]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[18]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[19]  Frank M. Bass,et al.  A New Product Growth for Model Consumer Durables , 2004, Manag. Sci..

[20]  R. Guide,et al.  Rough-cut capacity planning for remanufacturing firms , 1997 .

[21]  Luk N. Van Wassenhove,et al.  Product Reuse Economics in Closed‐Loop Supply Chain Research , 2008 .

[22]  Carsten Franke,et al.  Remanufacturing of mobile phones—capacity, program and facility adaptation planning , 2006 .

[23]  Erwin van der Laan,et al.  Quantitative models for reverse logistics: A review , 1997 .

[24]  Patroklos Georgiadis,et al.  A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains , 2007, Comput. Oper. Res..

[25]  Geraldo Ferrer,et al.  The economics of tire remanufacturing , 1997 .

[26]  Nico Vandaele,et al.  Reverse logistics network design with stochastic lead times , 2007, Comput. Oper. Res..

[27]  Martin Belusko,et al.  An evaluation model of product upgradeability for remanufacture , 2007 .

[28]  Surendra M. Gupta,et al.  Remanufacturing control in multistage systems with stochastic recovery rates , 2004, SPIE Optics East.

[29]  Hokey Min,et al.  A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns , 2006 .

[30]  E. Sundin,et al.  Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .

[31]  Wolfgang Grimm,et al.  Reuse of Electric Motors in Consumer Products , 1998 .

[32]  F. Bass A new product growth model for consumer durables , 1976 .

[33]  Gilvan C. Souza,et al.  Time Value of Commercial Product Returns , 2006, Manag. Sci..

[34]  Matthew J. Realff,et al.  Assessing performance and uncertainty in developing carpet reverse logistics systems , 2007, Comput. Oper. Res..

[35]  Patroklos Georgiadis,et al.  Long-term Analysis of Closed-loop Supply Chains , 2004 .

[36]  Luk N. Van Wassenhove,et al.  The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles , 2007, Manag. Sci..

[37]  Maria Besiou,et al.  Official Recycling and Scavengers: Symbiotic or Conflicting? , 2010 .

[38]  C. Gaimon Simultaneous and dynamic price, production, inventory and capacity decisions , 1988 .

[39]  D. Sterman,et al.  Misperceptions of Feedback in a Dynamic Decision Making Experiment , 1989 .

[40]  V. Daniel R. Guide,et al.  Building contingency planning for closed-loop supply chains with product recovery , 2003 .