Optimal service parts contract with multiple response times and on-site spare parts

This study examines user outsourcing of spare parts management to vendors through a service contract. The user’s selection of a fixed-price service parts contract is formulated as a stochastic integer programming model that decides multiple response times and on-site spare parts, while considering component breakdown with uncertain failure rates. We analytically derive the optimality conditions for the continuous case and subsequently design an efficient algorithm. Numerical illustrations and analyses are conducted to evaluate decisions under various scenarios. Our analysis shows that when both failure rate and expedited contract cost are high, coupled with low part cost, users would prefer the purchase of spare parts for all components to expedited contracts. A fixed-price expedited contract has a lower marginal cost with respect to failure rate than a fixed-price next day contract and a usage-based contract. We also examine inventory behaviour for a single part, multiple types of parts, and multiple groups of parts. It is shown that there is a cost-saving pooling effect in spare parts for identical items, which significantly raises the likelihood of having on-site stored parts. The problem becomes more complex for multiple items, reflecting bundling effects between items for a given contract.

[1]  Tarkan Tan,et al.  An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse , 2010, Oper. Res. Lett..

[2]  Timothy S. Vaughan,et al.  Production , Manufacturing and Logistics Failure replacement and preventive maintenance spare parts ordering policy , 2004 .

[3]  van Geert-Jan Geert-Jan Houtum,et al.  System-oriented inventory models for spare parts , 2014 .

[4]  Margaret K. Schaefer A Multi-Item Maintenance Center Inventory Model for Low-Demand Reparable Items , 1983 .

[5]  C. Henin Optimal Replacement Policies for a Single Loaded Sliding Standby , 1972 .

[6]  Bin Dan,et al.  Strategies for warranty service in a dual-channel supply chain with value-added service competition , 2018, Int. J. Prod. Res..

[7]  Dirk Cattrysse,et al.  Stocking decisions for repairable spare parts pooling in a multi-hub system , 2005 .

[8]  Geert-Jan van Houtum,et al.  The impact of an emergency warehouse in a two-echelon spare parts network , 2019, Eur. J. Oper. Res..

[9]  Jmj Marco Schutten,et al.  Inventory reduction in spare part networks by selective throughput time reduction , 2013 .

[10]  Rajesh Piplani,et al.  A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..

[11]  Mahmut Parlar,et al.  A survey of maintenance models for multi-unit systems , 1991 .

[12]  D. N. Prabhakar Murthy,et al.  Optimal decision making in a maintenance service operation , 1999, Eur. J. Oper. Res..

[13]  Claude G Henin,et al.  Optimal replacement policies with two or more loaded sliding standbys , 1983 .

[14]  Wenbin Wang,et al.  A stochastic model for joint spare parts inventory and planned maintenance optimisation , 2012, Eur. J. Oper. Res..

[15]  David Simchi-Levi,et al.  Two-echelon spare parts inventory system subject to a service constraint , 2004 .

[16]  Jacobus J. Arts,et al.  Spare parts planning and control for maintenance operations , 2009 .

[17]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[18]  Dirk Cattrysse,et al.  Multi-item spare parts systems with lateral transshipments and waiting time constraints , 2006, Eur. J. Oper. Res..

[19]  Armin Lüer-Villagra,et al.  Optimal repairable spare-parts procurement policy under total business volume discount environment , 2017, Reliab. Eng. Syst. Saf..

[20]  Srinivas Talluri,et al.  Optimal supply contract selection , 2010 .

[21]  Eugene Levner,et al.  A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand , 2011 .

[22]  Hiroaki Sandoh,et al.  A stochastic model on an additional warranty service contract , 2006, Comput. Math. Appl..

[23]  M. Rönnqvist,et al.  Cost allocation in inventory pools of spare parts with service-differentiated demand classes , 2015 .

[24]  Min Xie,et al.  A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting , 2015 .

[25]  Zixian Liu,et al.  Designing and pricing of two-dimensional extended warranty contracts based on usage rate , 2014 .

[26]  Che Soong Kim,et al.  WARRANTY AND PREVENTIVE MAINTENANCE , 2001 .

[27]  Alenka Hudoklin,et al.  Joint optimization of block-replacement and periodic-review spare-provisioning policy , 2003, IEEE Trans. Reliab..

[28]  Victor Zverovich,et al.  Modelling and solution methods for stochastic optimisation , 2011 .

[29]  David Z.W. Wang,et al.  A heuristic stock allocation rule for repairable service parts , 2017 .

[30]  Yue Wang,et al.  Mass Customizing Spare Parts Support Services Based on Response Time With Inventory Pooling Strategies , 2016, IEEE Transactions on Engineering Management.

[31]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..

[32]  D. N. P. Murthy,et al.  An Optimal Policy for Servicing Warranty , 1986 .

[33]  Bowon Kim,et al.  Optimal pricing, EOL (end of life) warranty, and spare parts manufacturing strategy amid product transition , 2008, Eur. J. Oper. Res..

[34]  A. A. Kranenburg,et al.  A new partial pooling structure for spare parts networks , 2009, Eur. J. Oper. Res..

[35]  Jun-Yeon Lee An incentive contract for leadtime reduction in an (S-1, S) inventory system , 2009, Comput. Oper. Res..

[36]  John E. Boylan,et al.  OR in spare parts management: A review , 2018, Eur. J. Oper. Res..

[37]  D. N. P. Murthy,et al.  Service contracts: A stochastic model , 2000 .