Results from the CLIC Test Facility CFT3 and update on the CLIC Design
暂无分享,去创建一个
[1] Steffen Döbert,et al. EFFICIENT LONG-PULSE FULLY LOADED CTF3 LINAC OPERATION , 2006 .
[2] Daniel Schulte,et al. OPTIMUM FREQUENCY AND GRADIENT FOR THE CLIC MAIN LINAC ACCELERATING STRUCTURE , 2006 .
[3] Luong,et al. THE PROBE BEAM LINAC IN CTF 3 , 2006 .
[4] Steffen Döbert,et al. Progress on the CTF3 Test Beam Line , 2006 .
[5] Yannis Papaphilippou,et al. Parameter Scan for the CLIC Damping Rings , 2008 .
[6] E. Jensen. CTF3 DRIVE BEAM ACCELERATING STRUCTURES , 2002 .
[7] Roger Ruber,et al. The Two-Beam Test-Stand in CTF 3 , 2006 .