Activity-based cost estimation in a push/pull advanced manufacturing system
暂无分享,去创建一个
[1] Andrew Kusiak,et al. Manufacturing control with a push-pull approach , 1998 .
[2] Eric W. Noreen,et al. Conditions Under Which Activity-Based Cost Systems Provide Relevant Costs , 2005 .
[3] R. Kaplan,et al. Measure Costs Right: Make the Right Decisions , 1988 .
[4] Maurice Bonney,et al. Are push and pull systems really so different , 1999 .
[5] Mustafa Özbayrak,et al. How successfully does JIT handle machine breakdowns in an automated manufacturing system , 2004 .
[6] Mark J. Kaiser,et al. PRICING INVESTMENT AND PRODUCTION ACTIVITIES FOR AN ADVANCED MANUFACTURING SYSTEM , 1997 .
[7] Ömer Faruk Baykoç,et al. Simulation modelling and analysis of a JIT production system , 1998 .
[8] Randall P. Sadowski,et al. Introduction to Simulation Using Siman , 1990 .
[9] Trevor A Spedding,et al. Application of discrete event simulation to the activity based costing of manufacturing systems , 1999 .
[10] Robin Cooper,et al. How Cost Accounting Systematically Distorts Product Costs , 1987 .
[11] W. G. Sullivan,et al. Impact of ABC information on product mix and costing decisions , 1995 .
[12] X. Koufteros. Testing a model of pull production: a paradigm for manufacturing research using structural equation modeling , 1999 .
[13] Luis Otávio Aleotti Maia,et al. Activity-based costing for production learning , 1999 .
[14] A. Thesen. Some simple, but efficient, push and pull heuristics for production sequencing for certain flexible manufacturing systems , 1999 .
[15] Tamás Koltai,et al. A flexible costing system for flexible manufacturing systems using activity based costing , 2000 .
[16] Robert C. Kee,et al. A comparative analysis of utilizing activity-based costing and the theory of constraints for making product-mix decisions , 2000 .