The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Respect to Various Arrival Distributions
暂无分享,去创建一个
[1] James R. Jackson,et al. Simulation research on job shop production , 1957 .
[2] Ross T. Nelson,et al. A PRE-COMPUTATIONAL REPORT ON JOB SHOP SIMULATION RESEARCH , 1959 .
[3] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .
[4] Alan S. Manne,et al. On the Job-Shop Scheduling Problem , 1960 .
[5] James R. Jackson. Queues with Dynamic Priority Discipline , 1961 .
[6] William L. Maxwell,et al. Network Dispatching by the Shortest-Operation Discipline , 1962 .
[7] Earl LeGrande. The Development of a Factory Simulation System Using Actual Operating Data , 1963 .
[8] R. T. Nelson. Labor and Machine Limited Production Systems , 1967 .
[9] William L. Maxwell,et al. Theory of scheduling , 1967 .
[10] Salah E. Elmaghraby. The machine sequencing problem – review and extensions , 1968 .
[11] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[12] Michael P. Hottenstein,et al. Expediting in Job-Order-Control Systems: A Simulation Study , 1970 .
[13] James E. Day,et al. Review of sequencing research , 1970 .
[14] C. L. Moodie,et al. A Dispatching Methodology for Balancing Workload Assignments in a Job Shop Production Facility , 1972 .