A Review of Minimizing Delay in Construction Industries

Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.

[1]  Mohd Zafrullah Mohd Taib,et al.  Imperative causes of delays in construction projects from developers' outlook , 2014 .

[2]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[3]  Henry Mwanaki Alinaitwe,et al.  Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects , 2013 .

[4]  Van Truong Luu,et al.  Delay factor analysis for hospital projects in Vietnam , 2016 .

[5]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[6]  Yue Choong Kog Project Management and Delay Factors of Public Housing Construction , 2018 .

[7]  Ismail Abdul Rahman,et al.  Ranking of Delay Factors for Makkah’s Construction Industry , 2017 .

[8]  Murat Gunduz,et al.  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .

[9]  Musirikare Mihigo Amandin,et al.  Project Delays on Cost Overrun Risks: A Study of Gasabo District Construction Projects Kigali, Rwanda , 2016 .

[10]  Shahid Hussain,et al.  Critical Delaying Factors: Public Sector Building Projects in Gilgit-Baltistan, Pakistan , 2018 .

[11]  A.W.M. Meijers,et al.  Philosophy of technology and engineering sciences , 2009 .

[12]  Swapnil Wanjari,et al.  Identifying factors causing cost overrun of the construction projects in India , 2016 .

[13]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[14]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[15]  Nasir Shafiq,et al.  Prospects of Building Information Modeling (BIM) in Malaysian Construction Industry as Conflict Resolution Tool , 2013 .

[16]  Zulfikar A. Adamu,et al.  Building Information Modelling for Construction Delay Management , 2017 .

[17]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .

[18]  S. Durdyev,et al.  Causes of delay in residential construction projects in Cambodia , 2017 .

[19]  Albert P.C. Chan,et al.  Investigating the causes of delay in grain bin construction projects: the case of China , 2019 .

[20]  Nasir Shafiq,et al.  Challenges for Implementation of Building Information Modeling (BIM) in Malaysian Construction Industry , 2014 .

[21]  Raj Kapur Shah,et al.  An Exploration Of Causes For Delay And Cost Overrun In Construction Projects: A Case Study Of Australia, Malaysia & Ghana , 2016 .

[22]  Nuzul Azam Haron,et al.  Improving cost and time control in construction using building information model (Bim): A review , 2018 .

[23]  Remon F. Aziz,et al.  Ranking of delay factors in construction projects after Egyptian revolution , 2013 .

[24]  Remon Fayek Aziz,et al.  Exploring delay causes of road construction projects in Egypt , 2016 .

[25]  Mohamed M. Marzouk,et al.  Analyzing delay causes in Egyptian construction projects , 2013, Journal of advanced research.

[26]  Thabani Nyoni,et al.  Towards Factors Affecting Delays in Construction Projects: A Case of Zimbabwe , 2017 .

[27]  Rahul S. Patil,et al.  EFFECT OF CONSTRUCTION DELAYS ON PROJECT TIME OVERRUN: INDIAN SCENARIO , 2014 .

[28]  Assefa Robel Schedule Delay Identification and Assessment on Addis Ababa’s Light Rail Transit Construction Project , 2015 .

[29]  K. N. Jha,et al.  Investigating Causes of Construction Delay in Ethiopian Construction Industries , 2016 .

[30]  Rao Aamir Khan,et al.  Emperical study of critical risk factors causing delays in construction projects , 2017, 2017 9th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS).

[31]  Theodore J. Trauner,et al.  Chapter 2 – Types of Construction Delays , 2009 .

[32]  Main Factors Causing Delays in Large Construction Projects: Evidence from New Zealand , 2017 .

[33]  Sameh M. El-Sayegh,et al.  Causes of claims in road construction projects in the UAE , 2018 .

[34]  Mamoon Mousa Atout Delays Caused by Project Consultants and Designers in Construction Projects , 2016 .

[35]  A. Boru Determinants of delay and cost overruns in Kenyan`s public sector construction projects: a case of Meru county, Kenya. , 2016 .

[37]  Ashok Pandey,et al.  Causes and Effects of Delays in Constrution Projets , 2017 .

[38]  Roslina Mohammad,et al.  A Management Framework to Reduce Delays in Road Construction Projects in Sudan , 2018 .

[39]  Mohd Razman Salim,et al.  Determining the Causes of Delay by Using Factor Analysis in Tehran’s Construction Projects , 2015 .