The observational method applied to a high embankment founded on sulphide clay
暂无分享,去创建一个
[1] Johan Spross,et al. Extended multivariate approach for uncertainty reduction in the assessment of undrained shear strength in clays , 2014 .
[2] V. Choa. APPLICATION OF THE OBSERVATIONAL METHOD TO HYDRAULIC FILL RECLAMATION PROJECTS , 1994 .
[3] Alan Powderham. THE OBSERVATIONAL METHOD - LEARNING FROM PROJECTS , 2002 .
[4] L. Eriksson. Temperature effects on consolidation properties of sulphide clays , 1989 .
[5] Kok-Kwang Phoon,et al. Linking Site Investigation Efforts to Final Design Savings with Simplified Reliability-Based Design Methods , 2014 .
[6] Gregory B. Baecher,et al. Formal Observational Approach to Staged Loading , 1997 .
[7] Stefan Larsson,et al. Stability for a high embankment founded on sulfide clay , 2013 .
[8] J. Q. Shang,et al. Probabilistic Design Method of Prefabricated Vertical Drains for Soil Improvement , 1999 .
[9] Ralph B. Peck,et al. Advantages and Limitations of the Observational Method in Applied Soil Mechanics , 1969 .
[10] Hamid Nikraz,et al. Observational method of assessing improvement of marine clay , 2004 .
[11] Rasmus Müller. Embankments founded on sulphide clay : - some aspects related to ground improvement by vertical drains , 2010 .
[12] J. M. Duncan,et al. Factors of Safety and Reliability in Geotechnical Engineering , 2000 .
[13] Han Ping Hong,et al. Probabilistic analysis of consolidation with prefabricated vertical drains for soil improvement , 1998 .
[14] F. Tavenas,et al. Lateral displacements in clay foundations under embankments , 1979 .
[15] Siew‐Ann Tan. ULTIMATE SETTLEMENT BY HYPERBOLIC PLOT FOR CLAYS WITH VERTICAL DRAINS. DISCUSSION AND CLOSURE , 1993 .
[16] Tim Chapman,et al. Observational method looks set to cut city building costs , 2004 .
[17] J. K. Vrijling,et al. Geotechnical applications and conditions of the observational method , 2005 .
[18] Rasmus Müller,et al. Veda trial embankment-comparison between measured and calculated deformations and pore pressure development , 2009 .
[19] Rasmus Müller,et al. Hydraulic Conductivity and Coefficient of Consolidation of Two Sulphide Clays in Sweden , 2012, Geotechnical and Geological Engineering.
[20] Tien H. Wu,et al. 2008 Peck Lecture: The Observational Method: Case History and Models , 2011 .
[21] Akira Asaoka,et al. OBSERVATIONAL PROCEDURE OF SETTLEMENT PREDICTION , 1978 .
[22] Rolf Larsson. Undrained shear strength in stability calculation of embankments and foundations on soft clays , 1980 .
[23] B Moritz,et al. Die Umsetzung der Beobachtungsmethode im Rahmen des Geotechnischen Sicherheitsmanagements / Application of the observational method in geotechnical safety management , 2009 .
[24] Charles C. Ladd,et al. Stability Evaluation during Staged Construction , 1991 .
[25] J. Spross,et al. On the observational method for groundwater control in the Northern Link tunnel project, Stockholm, Sweden , 2014, Bulletin of Engineering Geology and the Environment.
[26] J. Christian,et al. Reliability Applied to Slope Stability Analysis , 1994 .
[27] Hamid Nikraz,et al. Preloading and prefabricated vertical drains design for foreshore land reclamation projects: a case study , 2007 .
[28] Rasmus Müller,et al. Probabilistic stability analysis of embankments founded on clay , 2013 .
[29] Kok-Kwang Phoon,et al. Reducing shear strength uncertainties in clays by multivariate correlations. , 2010 .
[30] G. Baecher. Reliability and Statistics in Geotechnical Engineering , 2003 .
[31] A. J. Powderham. THE OBSERVATIONAL METHOD: APPLICATION THROUGH PROGRESSIVE MODIFICATION , 1998 .
[32] Wulf Schubert Prof. Dipl.-Ing. Dr. mont.,et al. Application of the observational method in geotechnical safety management. Die Umsetzung der Beobachtungsmethode im Rahmen des Geotechnischen Sicherheitsmanagements , 2009 .