Computer aided optimization of scheduling and machining parameters in job shop manufacturing systems
暂无分享,去创建一个
[1] T. Yamada,et al. Job shop scheduling , 1997 .
[2] M. C. Cakir,et al. Optimization of machining conditions for multi-tool milling operations , 2000 .
[3] Jatinder N. D. Gupta,et al. Flowshop scheduling with set-up, processing and removal times separated , 1991 .
[4] S. Zolfaghari,et al. Jointly solving the group scheduling and machining speed selection problems: A hybrid tabu search and simulated annealing approach , 1999 .
[5] Elsayed A. Elsayed,et al. Job shop scheduling with alternative machines , 1990 .
[6] Didier Dubois,et al. Fuzzy constraints in job-shop scheduling , 1995, J. Intell. Manuf..
[7] Jim Hutchison,et al. Scheduling approaches for random job shop flexible manufacturing systems , 1991 .
[8] Soumen Ghosh,et al. An evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling , 1993 .
[9] B. K. Lambert,et al. Optimization of multi-pass machining operations , 1978 .
[10] Kenji Itoh,et al. A knowledgeable simulated annealing scheme for the early/tardy flow shop scheduling problem , 1995 .
[11] G. K. Lal,et al. Determination of optimal subdivision of depth of cut in multipass turning with constraints , 1995 .
[12] Y. H. Lee,et al. An economic machining process model using fuzzy non-linear programming and neural network , 1999 .
[13] Bernard Penz,et al. An aggregation procedure for the deterministic job-shop problem , 1995, J. Intell. Manuf..
[14] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[15] I. Yellowley,et al. The optimal subdivision of cut in multi-pass machining operations , 1989 .
[16] K. Ridgway,et al. Selection of cutting tools and conditions of machining operations using an expert system , 2000 .
[17] Masataka Yoshimura,et al. Design and scheduling for flexible manufacturing cells with automatic set-up equipment , 1989 .
[18] Yih-Long Chang,et al. Optimal nondelay job shop schedules , 1990 .
[19] D. S. Ermer,et al. Optimization of Multipass Turning With Constraints , 1981 .
[20] Taeyong Yang,et al. A MULTIPLE-PASS HEURISTIC RULE FOR JOB-SHOP SCHEDULING WITH DUE-DATES , 1993 .
[21] Stanley B. Gershwin,et al. Scheduling job shops with delays , 1991 .
[22] Yung C. Shin,et al. Optimization of machining conditions with practical constraints , 1992 .
[23] Stanley B. Gershwin,et al. Scheduling job shops with delays , 1987, Proceedings. 1987 IEEE International Conference on Robotics and Automation.
[24] E. Aanen,et al. A scheduling approach for a flexible manufacturing system , 1993 .
[25] Jatinder N. D. Gupta,et al. Flow shop scheduling with multiple operations and time lags , 1995, J. Intell. Manuf..
[26] Abdulrahman Al-Ahmari,et al. Mathematical model for determining machining parameters in multipass turning operations with constraints , 2001 .
[27] Faiz A. Al-Khayyal,et al. Machine parameter selection for turning with constraints: an analytical approach based on geometric programming , 1991 .
[28] Oded Maimon,et al. Value function approximation via linear programming for FMS scheduling , 1990 .