An integrated staff-sizing approach considering feasibility of scheduling decision

Abstract This paper presents an integrated staff-sizing system for analyzing and determining workforce management policies with consideration of staff flexibility in service organizations, which addresses and captures the integrated requirements between long-term manpower planning and short-term staff scheduling in the service sector. Multiple Objective Linear Programming (MOLP) is applied to optimize several diversified goals. Solution methods to the MOLP models for the staff planning and staff scheduling are developed respectively, then a solution approach is proposed to iteratively revise the unacceptable staff-sizing plan or scheduling plan. Finally, an example of nurse sizing is analyzed and computational studies are carried out to investigate managerial insights.

[1]  Irem Ozkarahan,et al.  An Implicit Goal Programming Model for the Tour Scheduling Problem Considering the Employee Work Preferences , 2004, Ann. Oper. Res..

[2]  John C. Henderson,et al.  An integrated approach for manpower planning in the service sector , 1982 .

[3]  Gustave J. Rath,et al.  Nurse Scheduling Using Mathematical Programming , 1976, Oper. Res..

[4]  P.-C. G. Vassiliou,et al.  Cost models in nonhomogeneous Markov systems , 1997, Eur. J. Oper. Res..

[5]  J. Edwards,et al.  A Survey of Manpower Planning Models and Their Application , 1983, The Journal of the Operational Research Society.

[6]  A. M. Bowey Corporate Manpower Planning , 1977 .

[7]  E A McConnell Staffing and scheduling at your fingertips. , 2000, Nursing management.

[8]  Yash P. Gupta,et al.  Solving the capacitated lot-sizing problem with backorder consideration , 2001, J. Oper. Res. Soc..

[9]  P. Poornachandran Rao A Dynamic Programming Approach to Determine Optimal Manpower Recruitment Policies , 1990 .

[10]  Sally McClean,et al.  Manpower planning models and their estimation , 1991 .

[11]  Götz Uebe,et al.  A cyclic integer covering problem , 1990 .

[12]  Alain Billionnet Integer programming to schedule a hierarchical workforce with variable demands , 1999, Eur. J. Oper. Res..

[13]  X. Cai,et al.  A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..

[14]  Samuel G. Davis,et al.  A dynamic programming approach to work force scheduling with time-dependent performance measures , 1981 .

[15]  Ralph E. Steuer,et al.  A multi-period, multiple criteria optimization system for manpower planning☆ , 1988 .

[16]  Yongjian Li,et al.  Optimal Manpower Planning with Temporal Labor and Contract Period Constraints , 2005, AAIM.

[17]  Hesham K. Alfares,et al.  Survey, Categorization, and Comparison of Recent Tour Scheduling Literature , 2004, Ann. Oper. Res..

[18]  Michael J. Brusco,et al.  An integrated analysis of nurse staffing and scheduling policies , 1996 .

[19]  William J. Abernathy,et al.  A Three-Stage Manpower Planning and Scheduling Model - A Service-Sector Example , 1973, Oper. Res..

[20]  Wilson L. Price,et al.  A review of mathematical models in human resource planning , 1980 .

[21]  Andreas T. Ernst,et al.  An Annotated Bibliography of Personnel Scheduling and Rostering , 2004, Ann. Oper. Res..

[22]  Stelios H. Zanakis,et al.  A Markovian Goal Programming Approach to Aggregate Manpower Planning , 1981 .

[23]  W. Taubert A Search Decision Rule for the Aggregate Scheduling Problem , 1968 .

[24]  M. Gen,et al.  Method for solving multiobjective aggregate production planning problem with fuzzy parameters , 1992 .

[25]  A. Charnes,et al.  A Goal Programming Model for Planning Officer Accessions , 1980 .

[26]  Avishai Mandelbaum,et al.  Telephone Call Centers: Tutorial, Review, and Research Prospects , 2003, Manuf. Serv. Oper. Manag..

[27]  Eric R. Zieyel Operations research : applications and algorithms , 1988 .

[28]  R. F. A. Hopes,et al.  Models of Manpower Systems , 1971 .

[29]  Clive Purkiss,et al.  Corporate manpower planning: a review of models , 1981 .