On the use of fuzzy clustering in construction simulation

This paper presents a methodology that integrates fuzzy clustering and computer simulation and demonstrates its use in modeling earthmoving operations. A simulation system (SimEarth) was developed to model earthmoving operations utilizing object-oriented features and discrete event simulation. Fuzzy clustering is used to provide realistic estimates of haulers' travel time so as to improve the accuracy of the simulation results. A case study involving the construction of a dam is presented to illustrate the capabilities the proposed simulation engine and the developed fuzzy clustering methodology for estimating haulers' travel time.

[1]  R. Yager,et al.  Approximate Clustering Via the Mountain Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..

[2]  Michael Pidd,et al.  Object-orientation, Discrete Simulation and the Three-Phase Approach , 1995 .

[3]  Mohamed Marzouk,et al.  Automated System for Cost Estimating of Earthmoving Operations , 2000 .

[4]  Terry Quatrani,et al.  Visual modeling with rational Rose and UML , 1998, Addison-Wesley object technology series.

[5]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .

[6]  Stephen L. Chiu,et al.  Fuzzy Model Identification Based on Cluster Estimation , 1994, J. Intell. Fuzzy Syst..

[7]  Michio Sugeno,et al.  Fuzzy identification of systems and its applications to modeling and control , 1985, IEEE Transactions on Systems, Man, and Cybernetics.

[8]  Amr A. Oloufa,et al.  Modeling Operational Activities in Object‐Oriented Simulation , 1993 .

[9]  Brenda McCabe,et al.  Belief networks in construction simulation , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[10]  Osama Moselhi,et al.  Optimizing earthmoving operations using object-oriented simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[11]  Sankar K. Pal,et al.  Fuzzy models for pattern recognition , 1992 .

[12]  Simon Smith,et al.  Earthmoving productivity estimation using linear regression techniques , 1999 .

[13]  Michael Forde,et al.  Analysis of earth-moving systems using discrete-event simulation , 1995 .

[14]  Ali Touran,et al.  Integration of simulation with expert systems , 1990 .

[15]  Simaan M. AbouRizk,et al.  Simphony: an environment for building special purpose construction simulation tools , 1999, WSC '99.

[16]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[17]  Daniel W. Halpin,et al.  Design of construction and process operations , 1976 .