Investigating Critical Non-Value Adding Activities and Their Resulting Wastes in BIM-Based Project Delivery

Building information modeling (BIM) is deemed a useful innovation for technological and sustainable development of the economy. It is partially used in building projects in Singapore, although its implementation is mandated by the local government, resulting in various wastes and suboptimal productivity. Little is known about how non-value adding (NVA) BIM implementation practices were perceived by the local practitioners and how these practices affected productivity in building projects in Singapore. This study aimed to identify critical NVA BIM implementation activities and investigate the criticality of their resulting wastes to productivity performance in the current project delivery process in Singapore. The results from a questionnaire survey of 73 experts and four post-survey interviews in Singapore revealed that 38 NVA BIM implementation activities were deemed critical, among which “lack of involvement by contractors to contribute site knowledge” in the design development phase was ranked top; the top five resulting wastes with highest criticalities were reworks/abortive works, requests for information, design deficiencies, defects, and waiting/idle time. Furthermore, an independent-samples t -test was conducted to examine whether construction firms and upfront stakeholders perceived the NVA activities differently. It was discovered that most NVA activities exerted more agreement from construction firms than upfront non-construction organizations. Six strategies were proposed to mitigate the NVA activities and wastes. The findings can help practitioners identify weak areas of their BIM implementation practices and prioritize resources accordingly to eliminate the wastes and foster sustainability, as well as help overseas project teams, with minor adjustments, customize their own NVA BIM implementation activities and management strategies.

[1]  G. A. Miller THE PSYCHOLOGICAL REVIEW THE MAGICAL NUMBER SEVEN, PLUS OR MINUS TWO: SOME LIMITS ON OUR CAPACITY FOR PROCESSING INFORMATION 1 , 1956 .

[2]  G. Albaum The Likert scale revisited: an alternate version , 1997 .

[3]  Alistair G.F. Gibb,et al.  Re-engineering through pre-assembly: client expectations and drivers , 2003 .

[4]  George Ofori,et al.  Building waste assessment score: design-based tool , 2004 .

[5]  Abdulsalam A. Al-Sudairi Evaluating the effect of construction process characteristics to the applicability of lean principles , 2007 .

[6]  Refaat H. Abdel-Razek,et al.  Labor productivity: Benchmarking and variability in Egyptian projects , 2007 .

[7]  Evelyn Ai Lin Teo,et al.  Empirical Investigation into Factors Affecting Exporting Construction Services in SMEs in Singapore , 2007 .

[8]  Thomas Froese,et al.  PRACTICE NOTE Building information modelling demystified: does it make business sense to adopt BIM? , 2009, ICIT 2008.

[9]  Sepani Senaratne,et al.  Lean construction as a strategic option : testing its suitability and acceptibility in Sri Lanka , 2008 .

[10]  Mike Kagioglou,et al.  BIM adoption and implementation for architectural practices , 2011 .

[11]  Wu Peng,et al.  Lean production, value chain and sustainability in precast concrete factory - a case study in Singapore , 2011 .

[12]  Sui Pheng Low,et al.  Lean Management and Low Carbon Emissions in Precast Concrete Factories in Singapore , 2012 .

[13]  Farzad Khosrowshahi,et al.  Roadmap for implementation of BIM in the UK construction industry , 2012 .

[14]  Kasun Hewage,et al.  Building Information Modeling (BIM) partnering framework for public construction projects , 2013 .

[15]  Yacine Rezgui,et al.  A GOVERNANCE APPROACH FOR BIM MANAGEMENT ACROSS LIFECYCLE AND SUPPLY CHAINS USING MIXED-MODES OF INFORMATION DELIVERY , 2013 .

[16]  Sui Pheng Low,et al.  Identification of non-value adding (NVA) activities in precast concrete installation sites to achieve low-carbon installation , 2013 .

[17]  Aj Marshall-Ponting,et al.  Exploring the adoption of building information modelling (BIM) in the Malaysian construction industry : a qualitative approach , 2013 .

[18]  Awad S. Hanna,et al.  Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems , 2013 .

[19]  Miroslaw J. Skibniewski,et al.  Effects of Building Information Modeling During Construction , 2014 .

[20]  Hafez Salleh,et al.  Capability of Building Information Modeling Application in Quantity Surveying Practice , 2014 .

[21]  Pete Smith,et al.  BIM Implementation – Global Strategies☆ , 2014 .

[22]  Irtishad Ahmad,et al.  Factors Influencing Integrated Project Delivery in Publicly Owned Construction Projects: An Information Modelling Perspective , 2014 .

[23]  Stephen Pullen,et al.  Impacts of heat waves and corresponding measures: a review , 2015 .

[24]  Jack C. P. Cheng,et al.  A review of the efforts and roles of the public sector for BIM adoption worldwide , 2015, J. Inf. Technol. Constr..

[25]  M. Skibniewski,et al.  A literature review of the factors limiting the application of BIM in the construction industry , 2015 .

[26]  Kuan Yew Wong,et al.  Application of lean construction principles to reduce construction process waste using computer simulation: A case study , 2015 .

[27]  Zhao Yu,et al.  Productivity improvement of precast shop drawings generation through BIM-based process re-engineering , 2015 .

[28]  Peng Wu,et al.  A review of benchmarking in carbon labelling schemes for building materials , 2015 .

[29]  Perry Forsythe,et al.  How Far Can BIM Reduce Information Asymmetry in the Australian Construction Context? , 2015 .

[30]  Yi-Kai Juan,et al.  Building information modeling acceptance and readiness assessment in Taiwanese architectural firms , 2016 .

[31]  Bon-Gang Hwang,et al.  A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects , 2016 .

[32]  Bon-Gang Hwang,et al.  Identifying Critical Success Factors for Green Business Parks: Case Study of Singapore , 2017 .

[33]  Longhui Liao,et al.  Critical Success Factors for enhancing the Building Information Modelling implementation in building projects in Singapore , 2017 .

[34]  Yacine Rezgui,et al.  Factors for effective BIM governance , 2017 .

[35]  Jae-Jun Kim,et al.  BIM-Based 4D Simulation to Improve Module Manufacturing Productivity for Sustainable Building Projects , 2017 .

[36]  Sui Pheng Low,et al.  A project management framework for enhanced productivity performance using building information modelling , 2017 .

[37]  M. Skibniewski,et al.  A CRITICAL REVIEW OF LEGAL ISSUES AND SOLUTIONS ASSOCIATED WITH BUILDING INFORMATION MODELLING , 2018, Technological and Economic Development of Economy.

[38]  Jyh-Bin Yang,et al.  Mixed approach to government BIM implementation policy: An empirical study of Taiwan , 2018, Journal of Building Engineering.

[39]  Longhui Liao,et al.  Organizational Change Perspective on People Management in BIM Implementation in Building Projects , 2018 .

[40]  George Zillante,et al.  Combining life cycle assessment and Building Information Modelling to account for carbon emission of building demolition waste: A case study , 2018 .

[41]  Elisa D. Sotelino,et al.  Interactions of Building Information Modeling, Lean and Sustainability on the Architectural, Engineering and Construction industry: A systematic review , 2018 .

[42]  Mingming Hu,et al.  Building-information-modeling enabled life cycle assessment, a case study on carbon footprint accounting for a residential building in China , 2018 .

[43]  Johnny Wong,et al.  Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts , 2018, Journal of Building Engineering.

[44]  Daniel W.M. Chan,et al.  Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: The case of Hong Kong , 2019, Journal of Building Engineering.

[45]  Ruoyu Jin,et al.  Facilitating Building Information Modelling (BIM) using Integrated Project Delivery (IPD): A UK perspective , 2019, Journal of Building Engineering.

[46]  Qing He,et al.  Investigating the Constraints to Buidling Information Modeling (BIM) Applications for Sustainable Building Projects: A Case of China , 2019, Sustainability.

[47]  D. Walker,et al.  The future of the management of projects in the 2030s , 2019, International Journal of Managing Projects in Business.

[48]  B. Hwang,et al.  Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies , 2019, Journal of Construction Engineering and Management.