ALISS: Advanced Linear Scheduling System
暂无分享,去创建一个
[1] David J. Harmelink,et al. Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM) , 2001 .
[2] Onur Behzat Tokdemir,et al. Effect of learning on line-of-balance scheduling , 2001 .
[3] Kris G. Mattila,et al. Comparison of Linear Scheduling Model and Repetitive Scheduling Method , 2003 .
[4] Onur Behzat Tokdemir,et al. CHALLENGES IN LINE-OF-BALANCE SCHEDULING , 2002 .
[5] Ching-Hwang Wang,et al. Controlling activity interval times in LOB scheduling , 1998 .
[6] David J. Harmelink. Linear scheduling model: float characteristics , 2001 .
[7] Jeffrey S. Russell,et al. Information technology (IT) and integration in the construction industry , 1995 .
[8] Onur Behzat Tokdemir,et al. Scheduling system for repetitive unit construction using line-of-balance technology , 2001 .
[9] Khaled A El-Rayes. Object-Oriented Model for Repetitive Construction Scheduling , 2001 .
[10] Onur Behzat Tokdemir,et al. Scheduling system for high rise building construction , 2002 .