Monitoring Railway Bridge KW51 Before, During, and After Retrofitting

Abstract This paper presents a data set obtained from a monitoring campaign of 15 months on a steel bowstring railway bridge in Leuven, Belgium. In this period, the connections of the diagonals to ...