Quantification of carbon emission of construction waste by using streamlined LCA: a case study of Shenzhen, China
暂无分享,去创建一个
Ting Wang | Huabo Duan | Huanyu Wu | Jiayuan Wang | Xifu Wang | Jiayuan Wang | H. Duan | Ting Wang | Xifu Wang | Huanyu Wu
[1] Giovanni Andrea Blengini,et al. Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy , 2009 .
[2] Gabriela Benveniste,et al. Simplified tools for global warming potential evaluation: when ‘good enough’ is best , 2010 .
[3] Javier R. Viguri,et al. Estimation of Construction and Demolition Waste (C&DW) Generation and Multicriteria Analysis of C&DW Management Alternatives: A Case Study in Spain , 2011 .
[4] Randolph Kirchain,et al. Exploring the viability of probabilistic under-specification to streamline life cycle assessment. , 2013, Environmental science & technology.
[5] Valeria Ibáñez-Forés,et al. Life cycle assessment of construction and demolition waste management systems: a Spanish case study , 2012, The International Journal of Life Cycle Assessment.
[6] Jiayuan Wang,et al. A model for estimating construction waste generation index for building project in China , 2013 .
[7] Giovanni Andrea Blengini,et al. The changing role of life cycle phases, subsystems and materials in the LCA of low energy buildings , 2010 .
[8] Rehan Sadiq,et al. An overview of construction and demolition waste management in Canada: a lifecycle analysis approach to sustainability , 2013, Clean Technologies and Environmental Policy.
[9] Charles J. Kibert,et al. Strategies for successful construction and demolition waste recycling operations , 1997 .
[10] Weisheng Lu,et al. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.
[11] Nilay Cosgun,et al. A study conducted to reduce construction waste generation in Turkey , 2007 .
[12] Per Levin,et al. Environmental assessment of rebuilding and possible performance improvements effect on a national scale , 2004 .
[13] Shabbir H Gheewala,et al. Estimation of construction waste generation and management in Thailand. , 2009, Waste management.
[14] Vivian W. Y Tam,et al. An investigation of construction wastes: an empirical study in Shenzhen , 2008 .
[15] Murat Kucukvar,et al. Evaluating environmental impacts of alternative construction waste management approaches using supply-chain-linked life-cycle analysis , 2014, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[16] O Ortiz,et al. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain. , 2010, Waste management.
[17] Parnuwat Usapein,et al. Evaluating the performance of 3R options to reduce landfill wastes using the 3R indicator (3RI): case study of polyethylene factories in Thailand , 2015 .