Reducing airport gate blockage in passenger aviation: Models and analysis
暂无分享,去创建一个
Jeremy Castaing | Ann Nguyen | Amy Mainville Cohn | Ishan Mukherjee | Lonny Hurwitz | Johan J. Müller | A. Cohn | I. Mukherjee | J. Castaing | Lonny Hurwitz | A.T.-A. Nguyen | Johan J. Müller
[1] Allan Larsen,et al. Airline Disruption Management - Perspectives, Experiences and Outlook , 2007 .
[2] George L. Nemhauser,et al. A Robust Fleet-Assignment Model with Hub Isolation and Short Cycles , 2004, Transp. Sci..
[3] Jonathan F. Bard,et al. Balancing user preferences for aircraft schedule recovery during irregular operations , 2000 .
[4] Jerzy A. Filar,et al. How Airlines and Airports Recover from Schedule Perturbations: A Survey , 2001, Ann. Oper. Res..
[5] I. Dovica,et al. Robust Tail Assignment , 2010 .
[6] Cynthia Barnhart,et al. Planning for Robust Airline Operations: Optimizing Aircraft Routings and Flight Departure Times to Minimize Passenger Disruptions , 2006, Transp. Sci..
[7] George L. Nemhauser,et al. Airline Crew Recovery , 2000, Transp. Sci..
[8] Eric Feron,et al. Robust Gate Assignment , 2011 .
[9] M. Grassi,et al. AIAA Guidance, Navigation, and Control Conference , 2008 .
[10] Diego Klabjan,et al. Airline Crew Scheduling , 2003 .
[11] Yi Zhu,et al. The over-constrained airport gate assignment problem , 2005, Comput. Oper. Res..
[12] George L. Nemhauser,et al. Airline Crew Scheduling Under Uncertainty , 2005, Transp. Sci..
[13] Amy Cohn,et al. AIRLINE RESOURCE SCHEDULING , 2011 .
[14] Sang Hyun Kim,et al. Impact of gate assignment on gate-holding departure control strategies , 2012, 2012 IEEE/AIAA 31st Digital Avionics Systems Conference (DASC).
[15] James A. Rome,et al. Preliminary Evaluation of Flight Delay Propagation through an Airline Schedule , 1999 .
[16] Marcial Lapp,et al. Modifying lines-of-flight in the planning process for improved maintenance robustness , 2012, Comput. Oper. Res..
[17] Ahmed F. Abdelghany,et al. A Proactive Crew Recovery Decision Support Tool for Commercial Airlines During Irregular Operations , 2004, Ann. Oper. Res..
[18] Dušan Teodorović. Airline Operations Research , 2017 .
[19] Shangyao Yan,et al. A decision support framework for handling schedule perturbation , 1996 .
[20] Peter Belobaba,et al. Analysis of the potential for delay propagation in passenger airline networks , 2008 .
[21] Chun Hung Cheng,et al. The use of meta-heuristics for airport gate assignment , 2012, Expert Syst. Appl..
[22] Omer Tsimhoni,et al. A recursion-based approach to simulating airline schedule robustness , 2008, 2008 Winter Simulation Conference.
[23] Amy Cohn,et al. Decreasing airline delay propagation by re-allocating scheduled slack , 2010 .
[24] Edmund K. Burke,et al. A multi-objective approach for robust airline scheduling , 2010, Comput. Oper. Res..
[25] Dušan Teodorović,et al. Model to Reduce Airline Schedule Disturbances , 1995 .
[26] Michel Bierlaire,et al. Constraint-specific recovery network for solving airline recovery problems , 2010, Comput. Oper. Res..
[27] Chendong Li. Airport Gate Assignment: New Model and Implementation , 2008, ArXiv.
[28] Nilay Noyan,et al. Stochastic optimization models for the airport gate assignment problem , 2012 .
[29] John R. Birge,et al. A Stochastic Programming Approach to the Airline Crew Scheduling Problem , 2006, Transp. Sci..
[30] BarnhartCynthia,et al. Planning for Robust Airline Operations , 2006 .
[31] Ali Haghani,et al. An optimization model for aircraft maintenance scheduling and re-assignment , 2003 .
[32] Ram Gopalan,et al. Mathematical models in airline schedule planning: A survey , 1998, Ann. Oper. Res..
[33] Ibrahim Eksin,et al. A stochastic neighborhood search approach for airport gate assignment problem , 2012, Expert Syst. Appl..
[34] Marcial Lapp. Methods for Improving Robustness and Recovery in Aviation Planning , 2012 .
[35] Srini Ramaswamy,et al. Airline Crew Scheduling with Regularity , 2001, Transp. Sci..
[36] Andrew Lim,et al. Robust airport gate assignment , 2005, 17th IEEE International Conference on Tools with Artificial Intelligence (ICTAI'05).