Fleet sizing of automated guided vehicles: a linear programming approach based on closed queuing networks
暂无分享,去创建一个
Xiaolei Huang | F. Fred Choobineh | Ardavan Asef-Vaziri | Xiaolei Huang | F. Choobineh | Ardavan Asef-Vaziri
[1] Martin W. P. Savelsbergh,et al. Minimum Vehicle Fleet Size Under Time-Window Constraints at a Container Terminal , 2005, Transp. Sci..
[2] S. L. Gobal,et al. Vehicle requirements model for automated guided vehicle systems , 1996 .
[3] Ronald Mantel,et al. Design and operational control of an AGV system , 1995 .
[4] J. A. Buzacott,et al. Flexible manufacturing systems: a review of analytical models , 1986 .
[5] Dong-Soon Yim,et al. Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system , 1993 .
[6] J. M. A. Tanchoco,et al. Solution methods for the mathematical models of single-loop AGV systems , 1993 .
[7] William L. Maxwell,et al. Design of Automatic Guided Vehicle Systems , 1982 .
[8] J. A. Buzacott,et al. Queueing models for a flexible machining station Part II: The method of Coxian phases , 1985 .
[9] Chelliah Sriskandarajah,et al. Operational Decisions in AGV-Served Flowshop Loops: Fleet Sizing and Decomposition , 2001, Ann. Oper. Res..
[10] P. J. Egbelu,et al. The use of non-simulation approaches in estimating vehicle requirements in an automated guided based transport system , 1987 .
[11] S. L. Gobal,et al. A simulation model for estimating vehicle requirements in automated guided vehicle systems , 1991 .
[12] Pyung-Hoi Koo,et al. Fleet sizing and vehicle routing for container transportation in a static environment , 2004, OR Spectr..
[13] M. Fischetti,et al. Heuristic algorithms for the multiple depot vehicle scheduling problem , 1993 .
[14] Pius J. Egbelu,et al. Characterization of automatic guided vehicle dispatching rules , 1984 .
[15] Pius J. Egbelu,et al. Determination of the total number of vehicles in an AGV-based material transport system , 1987 .
[16] Marc Goetschalckx,et al. Dual track and segmented single track bidirectional loop guidepath layout for AGV systems , 2008, Eur. J. Oper. Res..
[17] John J. Bartholdi,et al. Decentralized Control of Automated Guided Vehicles on a Simple Loop , 1989 .
[18] Gilbert Laporte,et al. Integration of operational policies into the design phase of a material handling network , 2008, Int. J. Adv. Oper. Manag..
[19] Pius J. Egbelu,et al. Use of spread sheet analysis for evaluating AGV systems , 1987 .
[20] Patrick Kellert,et al. Representing the Material Handling System in Tractable Queuing Network Models of Flexible Manufacturing Systems: A Workload Data Aggregation Approach , 1999 .
[21] J. M. A. Tanchoco,et al. An economic model for determining AGV fleet size , 1992 .
[22] Kripa Shanker,et al. DETERMINATION OF OPTIMAL AGV FLEET SIZE FOR AN FMS , 1998 .
[23] T. T. Narendran,et al. Design of an automated guided vehicle-based material handling system for a flexible manufacturing system , 1990 .
[24] Charles J. Malmborg,et al. A model for the design of zone control automated guided vehicle systems , 1990 .
[25] T. T. Narendran,et al. Estimation of number of AGVs for an FMS: an analytical model , 1993 .
[26] Pius J. Egbelu,et al. Determination of vehicle requirements in automated guided vehicle systems: A statistical approach , 2000 .
[27] M. Eric Johnson,et al. Modelling empty vehicle traffic in AGVS design , 2001 .
[28] Iris F. A. Vis,et al. Determination of the number of automated guided vehicles required at a semi-automated container terminal , 2001, J. Oper. Res. Soc..
[29] John E. Kobza,et al. A dispatching-rule-based algorithm for automated guided vehicle systems design , 1998 .
[30] Kees Jan Roodbergen,et al. Determination of the number of AGVs required at a semi-automated container terminal , 2000 .
[31] D. J. Todd. Automated Guided Vehicles , 1986 .
[32] Mansour Rahimi,et al. Design and analysis of an automated container handling system in seaports , 2008 .
[33] Oliver Ilic,et al. Analysis of the number of automated guided vehicles required in flexible manufacturing systems , 1994 .
[34] S Khajenoori,et al. A Microcomputer Program For Computing Standard Criteria In Engineering Economy , 1990 .
[35] Ramakrishna Desiraju,et al. Performance Analysis of Flexible Manufacturing Systems with a Single Discrete Material-Handling Device , 1997 .
[36] Dong-Won Jang,et al. Fleet sizing and vehicle routing for container transportation in a static environment , 2004, OR Spectr..
[37] D. L. Kimbler,et al. Assignement of AGVS with different vehicle types , 1987 .
[38] Yavuz A. Bozer,et al. TRIP-BASED MATERIAL HANDLING SYSTEMS: THROUGHPUT CAPACITY ANALYSIS , 1994 .