Investment Risk Assessment of Dispersed Wind Power in Low Wind Speed Area Using a Hybrid Multi-Criteria Decision-Making Approach Based on Hesitant Fuzzy Linguistic Environment

Reducing the phenomenon of wind curtailment is essential to improve the level of wind power consumption. Wind power development in China has shifted to southeast region and dispersed wind power has developed rapidly and gradually become the new main force. However, various obstacles limit the smooth progress of dispersed wind power in low wind speed area. An important point is the absence of targeted risk analysis and evaluation methods. Therefore, the principal contribution of this paper is to find out the critical risk factors of such projects and propose the risk assessment model. First, 18 critical risk factors are identified using the constructed five-dimensional risk analysis model. Second, the hesitant fuzzy linguistic term set with credibility is utilized to collect evaluation information on one hand and to improve the multicriteria decision-making methods involved on the other hand. Third, the risk evaluation and ranking for 10 provinces that mainly develop dispersed wind power is carried out. The evaluation results indicate that the risk level of dispersed wind power projects is “Relatively Low” in most study provinces and the risk levels of Guangdong and Fujian are higher. It is worth noting that the consistency between the evaluation results and the distribution of wind resources can be used to guide the formulation of stimulus policies. Besides, the ranking results show some preference for investment choice. Finally, dual sensitivity analysis tests the stability of the model and shows the ranking results under different decision preferences. Scenario analysis gives the possible risk scenarios and evaluation results in the future. This study can provide insightful inspiration to wind power investors, risk management practitioners, and policymakers.

[1]  Zeshui Xu,et al.  Hesitant Fuzzy Linguistic VIKOR Method and Its Application in Qualitative Multiple Criteria Decision Making , 2015, IEEE Transactions on Fuzzy Systems.

[2]  Jing Wang,et al.  An extended TODIM-PROMETHEE method for waste-to-energy plant site selection based on sustainability perspective , 2018, Energy.

[3]  Patrick Hendrick,et al.  Evaluation of the impact of wind farms on birds: The case study of Lebanon , 2015 .

[4]  W. Pearn,et al.  An Integrated Multi-Criteria Decision Making Model for Evaluating Wind Farm Performance , 2011 .

[5]  Jie Li,et al.  Assessing the Architectural Design Services by Using DEMATEL Approach , 2009, 2009 International Conference on Computational Intelligence and Natural Computing.

[6]  Li Hua Improvement on Judgement Matrix Based on Triangle Fuzzy Number , 2003 .

[7]  Yuhan Wang,et al.  Risk analysis in ultra deep scientific drilling project — A fuzzy synthetic evaluation approach , 2013 .

[8]  Krassimir T. Atanassov,et al.  Intuitionistic fuzzy sets , 1986 .

[9]  Yunna Wu,et al.  Risk assessment on offshore photovoltaic power generation projects in China based on a fuzzy analysis framework , 2019, Journal of Cleaner Production.

[10]  Yunna Wu,et al.  A hybrid fuzzy multi-criteria decision-making approach for performance analysis and evaluation of park-level integrated energy system , 2019, Energy Conversion and Management.

[11]  Eric W. M. Stienen,et al.  Towards a cumulative collision risk assessment of local and migrating birds in North Sea offshore wind farms , 2015, Hydrobiologia.

[12]  Yunna Wu,et al.  Risk assessment of urban rooftop distributed PV in energy performance contracting (EPC) projects: An extended HFLTS-DEMATEL fuzzy synthetic evaluation analysis , 2019, Sustainable Cities and Society.

[13]  Yang Junyo Reactive Power Control Strategy for Dispersed Wind Farm Considering Wind Power Forecasting , 2015 .

[14]  Yang Wang,et al.  Social sustainability assessment of small hydropower with hesitant PROMETHEE method , 2017 .

[15]  Peide Liu An approach to group decision making based on 2-dimension uncertain linguistic information , 2012 .

[16]  Gwo-Hshiung Tzeng,et al.  Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..

[17]  Athanasios Kolios,et al.  Multi-criteria risk assessment approach for components risk ranking – The case study of an offshore wave energy converter , 2017 .

[18]  Yang Wang,et al.  A risk assessment framework of PPP waste-to-energy incineration projects in China under 2-dimension linguistic environment , 2018 .

[19]  Gwo-Hshiung Tzeng,et al.  A value-created system of science (technology) park by using DEMATEL , 2009, Expert Syst. Appl..

[20]  Ronald R. Yager,et al.  An approach to ordinal decision making , 1995, Int. J. Approx. Reason..

[21]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[22]  S. Al-Yahyai,et al.  Assessment of large-scale wind energy potential in the emerging city of Duqm (Oman) , 2015 .

[23]  Haobo Zhang,et al.  A cloud decision framework in pure 2-tuple linguistic setting and its application for low-speed wind farm site selection , 2017 .

[24]  Gwo-Hshiung Tzeng,et al.  Multicriteria Planning of Post‐Earthquake Sustainable Reconstruction , 2002 .

[25]  Fang Li,et al.  A Decision Framework for Electric Vehicle Charging Station Site Selection for Residential Communities under an Intuitionistic Fuzzy Environment: A Case of Beijing , 2017 .

[26]  Mohan M. Kumaraswamy,et al.  An evaluation of construction time performance in the building industry , 1996 .

[27]  Alan Griffith,et al.  Establishing Integrated Management Systems (IMS) within Principal Contracting Organisations , 2007 .

[28]  Xue Yushen A Review on Impacts of Wind Power Uncertainties on Power Systems , 2014 .

[29]  P. Lam,et al.  Probabilistic risk assessment of the energy saving shortfall in energy performance contracting projects–A case study , 2013, Energy and Buildings.

[30]  Francisco Herrera,et al.  Hesitant Fuzzy Linguistic Term Sets for Decision Making , 2012, IEEE Transactions on Fuzzy Systems.

[31]  Francisco Herrera,et al.  A 2-tuple fuzzy linguistic representation model for computing with words , 2000, IEEE Trans. Fuzzy Syst..

[32]  Jamie Brown Kruse,et al.  Analysis of Time-varying Turbulence in Geographically-dispersed Wind Energy Markets , 2008 .

[33]  Rehan Sadiq,et al.  Developing a level of service (LOS) index for operational management of public buildings , 2017 .

[34]  Kazim Baris Atici,et al.  A GIS-based Multiple Criteria Decision Analysis approach for wind power plant site selection , 2015 .

[35]  Klaus Hubacek,et al.  What to expect from a greater geographic dispersion of wind farms? A risk portfolio approach , 2007 .

[36]  Anas Sakout,et al.  Institutional factors influencing strategic decision-making in energy policy; a case study of wind energy in France and Quebec (Canada) , 2016 .

[37]  Y. Gagnon,et al.  An analysis of feed-in tariff remuneration models: Implications for renewable energy investment , 2010 .

[38]  Haiyan Lu,et al.  Comprehensive assessment of wind resources and the low-carbon economy: An empirical study in the Alxa and Xilin Gol Leagues of inner Mongolia, China , 2015 .

[39]  Lin Li,et al.  Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project , 2018, Appl. Soft Comput..

[40]  P. Lam,et al.  Cross-Sectional Analysis of Critical Risk Factors for PPP Water Projects in China , 2015 .

[41]  Alexandros Nikas,et al.  Exploring opportunities and risks for RES-E deployment under Cooperation Mechanisms between EU and Western Balkans: A multi-criteria assessment , 2017 .

[42]  Yunna Wu,et al.  Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis , 2017 .

[43]  Qixin Chen,et al.  Electricity markets evolution with the changing generation mix: An empirical analysis based on China 2050 High Renewable Energy Penetration Roadmap ☆ , 2017 .

[44]  Dionysios Latinopoulos,et al.  A GIS-based multi-criteria evaluation for wind farm site selection. A regional scale application in Greece , 2015 .

[45]  G. Sakthivel,et al.  A decision support system to evaluate the optimum fuel blend in an IC engine to enhance the energy efficiency and energy management , 2017 .

[46]  Peng Li,et al.  Analysis of wind power generation operation management risk in China , 2014 .

[47]  Haobo Zhang,et al.  Study of decision framework of wind farm project plan selection under intuitionistic fuzzy set and fuzzy measure environment , 2014 .

[48]  Fabio Monforti,et al.  Comparing the impact of uncertainties on technical and meteorological parameters in wind power time series modelling in the European Union , 2017 .

[49]  Taher Niknam,et al.  Multi-objective probabilistic reactive power and voltage control with wind site correlations , 2014 .

[50]  Bon-Gang Hwang,et al.  A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects , 2016 .

[51]  Subash Pd. Rai,et al.  Risk assessment for transboundary rivers using fuzzy synthetic evaluation technique , 2014 .

[52]  Nikolaus Ederer,et al.  The right size matters: Investigating the offshore wind turbine market equilibrium , 2014 .

[53]  Siamak Haji Yakhchali,et al.  Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment , 2013 .

[54]  Wei Peng,et al.  Assessing risk management capability of contractors in subway projects in mainland China , 2014 .

[55]  Cengiz Kahraman,et al.  Multi-expert wind energy technology selection using interval-valued intuitionistic fuzzy sets , 2015 .

[56]  Francisco Herrera,et al.  A Sequential Selection Process in Group Decision Making with a Linguistic Assessment Approach , 1995, Inf. Sci..

[57]  Xinyue Ye,et al.  A group-based spatial decision support system for wind farm site selection in Northwest Ohio , 2013 .

[58]  Zeshui Xu,et al.  Distance and similarity measures for hesitant fuzzy linguistic term sets and their application in multi-criteria decision making , 2014, Inf. Sci..

[59]  Alstom Grid,et al.  Review of Transmission Planning for Integrating Large Clusters of Wind Power , 2014 .