Modeling and Optimization of multiple product FMS using Colored Petri Net and Design of Experiment

This study aims to optimize a pull type multi-product, multi-line and multi-stage Flexible Manufacturing System whose resources are subject to breakdown conditions. To ensure continual supply of the finished products, under breakdown conditions, the parts/ materials are flowing through alternate routes exhibiting routing flexibility. Every machining and assembly station has been equipped with automated inspection units to inspect the quality of the products. The system is modeled through Colored Petri net methodology and the impact of input factors has been shown on the performance of the system. The study explores multi-factor optimization using Design of Experiment and Response surface Methods.

[1]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[2]  Colin L. Moodie,et al.  Definition and Classification of Manufacturing Flexibility Types and Measures , 1998 .

[3]  Ali Gharbi,et al.  A simulation optimization based control policy for failure prone one-machine, two-product manufacturing systems , 2004, Comput. Ind. Eng..

[4]  Z. Kasirolvalad,et al.  An intelligent modeling system to improve the machining process quality in CNC machine tools using adaptive fuzzy Petri nets , 2006 .

[5]  Huiran Liu,et al.  Multiple-objective real-time scheduler for semiconductor wafer fab using Colored Timed Object-oriented Petri nets (CTOPN) , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).

[6]  M. K. Tiwari,et al.  Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability , 2004 .

[7]  G. Derringer,et al.  Simultaneous Optimization of Several Response Variables , 1980 .

[8]  R. Smith,et al.  Fuzzy Petri nets to model and control output quality from a flexible manufacturing cell , 1994, Proceedings of the Fourth International Conference on Computer Integrated Manufacturing and Automation Technology.

[9]  Wei Ding,et al.  On deadlock prevention in case of failures in flexible manufacturing systems , 2006, Int. J. Manuf. Technol. Manag..

[10]  Stewart Robinson A statistical process control approach for estimating the warm-up period , 2002, Proceedings of the Winter Simulation Conference.