Real-time research of mine industrial ethernet network based on massive data flow video load
暂无分享,去创建一个
[1] Bi Xiang. Design of Industrial Ethernet Network System with Load Analysis and GA , 2006 .
[2] Qizhi Zhang,et al. Determine the maximum closed-loop control delay in switched industrial Ethernet using network calculus , 2006, 2006 American Control Conference.
[3] Liu Fu. Research on network structure of multimedia integrated services digital network in mine(MISDN) , 2003 .
[4] P. Torab,et al. Load analysis of packet switched networks in control systems , 1999, IECON'99. Conference Proceedings. 25th Annual Conference of the IEEE Industrial Electronics Society (Cat. No.99CH37029).
[5] Zhang Weidong. Calculation of maximum delay in switched industrial Ethernet based on network calculus , 2005 .