A hybrid and integrated approach to evaluate and prevent disasters
暂无分享,去创建一个
[1] D. Y. Sha,et al. Supply chain network design: partner selection and production/distribution planning using a systematic model , 2006, J. Oper. Res. Soc..
[2] Poong-Hyun Seong,et al. A human-machine interface evaluation method: A difficulty evaluation method in information searching (DEMIS) , 2009, Reliab. Eng. Syst. Saf..
[3] T Paulos,et al. A methodology to select a wire insulation for use in habitable spacecraft. , 1998, Risk analysis : an official publication of the Society for Risk Analysis.
[4] Rizwan Ahmed,et al. Design of safety-critical systems using the complementarities of success and failure domains with a case study , 2011, Reliab. Eng. Syst. Saf..
[5] Poong-Hyun Seong,et al. A method for risk-informed safety significance categorization using the analytic hierarchy process and bayesian belief networks , 2004, Reliab. Eng. Syst. Saf..
[6] Lu Chen,et al. Using Vector Projection Method to evaluate maintainability of mechanical system in design review , 2003, Reliab. Eng. Syst. Saf..
[7] Brian Veitch,et al. Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations , 2011, Risk analysis : an official publication of the Society for Risk Analysis.
[8] MaCarmen Carnero. An evaluation system of the setting up of predictive maintenance programmes , 2006 .
[9] D. Varma,et al. Methyl Isocyanate: The Bhopal Gas , 2009 .
[10] D. I. Cho,et al. An integrated approach for supplier selection and purchasing decisions , 2008 .
[11] Brian Veitch,et al. Handling and updating uncertain information in bow-tie analysis , 2012 .
[12] S. Wheeler,et al. An analysis of combined arms teaming for the Australian defence force , 2006, J. Oper. Res. Soc..
[13] Brian Veitch,et al. Methodology for computer aided fuzzy fault tree analysis , 2009 .
[14] Ali Kokangül,et al. Integrated analytical hierarch process and mathematical programming to supplier selection problem with quantity discount , 2009 .
[15] Thomas L. Saaty,et al. The analytic hierarchy process and human resource allocation: Half the story , 2007, Math. Comput. Model..
[16] Philip E. T. Lewis,et al. Research Methods for Business Students , 2006 .
[17] David Barber,et al. Ranking the Risks from Multiple Hazards in a Small Community , 2009, Risk analysis : an official publication of the Society for Risk Analysis.
[18] Nima Khakzad,et al. Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches , 2011, Reliab. Eng. Syst. Saf..
[19] J. N. Sørensen,et al. Safety culture: a survey of the state-of-the-art , 2002, Reliab. Eng. Syst. Saf..
[20] W. Liu,et al. Using SSM to structure the identification of inputs and outputs in DEA , 2009, J. Oper. Res. Soc..
[21] I. Linkov,et al. Multicriteria Decision Analysis: A Comprehensive Decision Approach for Management of Contaminated Sediments , 2006, Risk analysis : an official publication of the Society for Risk Analysis.
[22] S. Rahman. Reliability Engineering and System Safety , 2011 .
[23] Maurizio Bevilacqua,et al. A combined goal programming - AHP approach to maintenance selection problem , 2006, Reliab. Eng. Syst. Saf..
[24] Frank P. Lees,et al. Loss Prevention In The Process Industries , 1980 .
[25] D. M. Karydas,et al. A method for the efficient prioritization of infrastructure renewal projects , 2006, Reliab. Eng. Syst. Saf..
[26] George E Apostolakis,et al. A Screening Methodology for the Identification and Ranking of Infrastructure Vulnerabilities Due to Terrorism , 2005, Risk analysis : an official publication of the Society for Risk Analysis.
[27] T. R. Chouhan,et al. The unfolding of Bhopal disaster , 2005 .
[28] Luis G. Vargas,et al. The allocation of intangible resources: the analytic hierarchy process and linear programming , 2003 .
[29] Hirofumi Fukuyama,et al. Evaluating public school district performance via DEA gain functions , 2002, J. Oper. Res. Soc..
[30] Mehrdad Tamiz,et al. An integrated queuing and multi-objective bed allocation model with application to a hospital in China , 2009, J. Oper. Res. Soc..
[31] M K Lindell,et al. Effects of the Chernobyl accident on public perceptions of nuclear plant accident risks. , 1990, Risk analysis : an official publication of the Society for Risk Analysis.
[32] Dragan Banjevic,et al. Prioritization of medical equipment for maintenance decisions , 2011, J. Oper. Res. Soc..
[33] Fermín Mallor,et al. Expert Judgment‐Based Risk Assessment Using Statistical Scenario Analysis: A Case Study—Running the Bulls in Pamplona (Spain) , 2008, Risk analysis : an official publication of the Society for Risk Analysis.
[34] L. C. Leung,et al. Implementing the balanced scorecard using the analytic hierarchy process & the analytic network process , 2006, J. Oper. Res. Soc..
[35] George T. S. Ho,et al. Multiple criteria optimization of contemporary logistics distribution network problems , 2010, OR Insight.
[36] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[37] Mónica García-Melón,et al. An ANP- and AHP-based approach for weighting criteria in public works bidding , 2010, J. Oper. Res. Soc..
[38] Faisal Khan,et al. Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network , 2013 .
[39] Alfred A. Marcus,et al. Bhopal: Anatomy of a Crisis , 1987 .
[40] N. K. Kwak,et al. Information resource planning for a health-care system using an AHP-based goal programming method , 1999, J. Oper. Res. Soc..
[41] Enrico Zio,et al. Human reliability analysis by fuzzy "CREAM". , 2007, Risk analysis : an official publication of the Society for Risk Analysis.
[42] Stanley S. Grossel. Learning from accidents, 3rd edition , 2002 .
[43] Enrico Cagno,et al. Using AHP in determining the prior distributions on gas pipeline failures in a robust Bayesian approach , 2000, Reliab. Eng. Syst. Saf..
[44] Jon Espen Skogdalen,et al. Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study , 2012, Reliab. Eng. Syst. Saf..
[45] Patricia G. Henderson,et al. What, Me Worry? , 1993, Clinical pediatrics.
[46] Robin L. Dillon,et al. Probabilistic risk analysis for the NASA space shuttle: a brief history and current work , 2001, Reliab. Eng. Syst. Saf..
[47] James H Lambert,et al. Decision Analysis and Risk Models for Land Development Affecting Infrastructure Systems , 2012, Risk analysis : an official publication of the Society for Risk Analysis.
[48] Jiju Antony,et al. Application of stochastic analytic hierarchy process within a domestic appliance manufacturer , 2007, J. Oper. Res. Soc..
[49] Louis Anthony Cox,et al. Risk Analysis Foundations, Models, and Methods , 2001 .
[50] Jamie Cassels,et al. The Uncertain Promise of Law: Lessons from Bhopal , 1991, Osgoode Hall Law Journal.
[51] M T Todinov. Reliability Analysis Based on the Losses from Failures , 2006, Risk analysis : an official publication of the Society for Risk Analysis.
[52] Cynthia Barounis,et al. “Why so serious?”: Cripping Camp Performance in Christopher Nolan’s The Dark Knight , 2013 .
[53] Jai P. Gupta. The Bhopal gas tragedy: could it have happened in a developed country? , 2002 .
[54] Marcelo Ramos Martins,et al. Human Error Contribution in Collision and Grounding of Oil Tankers , 2010, Risk analysis : an official publication of the Society for Risk Analysis.
[55] Faisal Khan,et al. Accident modeling approach for safety assessment in an LNG processing facility , 2012 .
[56] Nima Khakzad,et al. Risk-based design of process systems using discrete-time Bayesian networks , 2013, Reliab. Eng. Syst. Saf..
[57] Alessio Ishizaka,et al. Does AHP help us make a choice? An experimental evaluation , 2011, J. Oper. Res. Soc..
[58] S Bonsall,et al. Use of Fuzzy Evidential Reasoning in Maritime Security Assessment , 2009, Risk analysis : an official publication of the Society for Risk Analysis.
[59] Nima Khakzad,et al. Dynamic risk analysis using bow-tie approach , 2012, Reliab. Eng. Syst. Saf..
[60] D.-W. Song,et al. Weighting the competitiveness factors for container ports under conflicting interests , 2010, J. Oper. Res. Soc..
[61] Raymond Gallucci. "What--me worry?" "Why so serious?": a personal view on the Fukushima nuclear reactor accidents. , 2012, Risk analysis : an official publication of the Society for Risk Analysis.
[62] R. Sadiq,et al. Analyzing system safety and risks under uncertainty using a bow-tie diagram: An innovative approach , 2013 .
[63] Faisal Khan,et al. SHIPP methodology: Predictive accident modeling approach. Part II. Validation with case study , 2011 .
[64] T. L. Saaty. A Scaling Method for Priorities in Hierarchical Structures , 1977 .
[65] Michael A. Elliott,et al. Selecting numerical scales for pairwise comparisons , 2010, Reliab. Eng. Syst. Saf..
[66] T. Saaty. Risk-Its Priority and Probability: The Analytic Hierarchy Process , 1987 .
[67] Brian Veitch,et al. Handling data uncertainties in event tree analysis , 2009 .
[68] Yong Shi,et al. Multiobjective linear programming model on injection oilfield recovery system , 1998 .
[69] F. Vuilleumier,et al. Safety aspects of railway and road tunnel: example of the Lötschberg railway tunnel and Mont-Blanc road tunnel , 2002 .
[70] Roli Varma,et al. The Bhopal Disaster of 1984 , 2005 .
[71] Robert W. Youngblood. Applying Risk Models to Formulation of Safety Cases , 1998 .
[72] Faisal Khan,et al. SHIPP methodology: Predictive accident modeling approach. Part I: Methodology and model description , 2011 .
[73] Philip E. T. Lewis,et al. Research Methods for Business Students (5th edn) , 2007 .
[74] Samith Rathnayaka,et al. System hazard identification prediction prevention (SHIPP) methodology predictive accident modeling approach , 2011 .
[75] Bhallamudi Ravi,et al. Web based casting supplier evaluation using analytical hierarchy process , 2001, J. Oper. Res. Soc..
[76] Ido Millet,et al. The Effectiveness of Alternative Preference Elicitation Methods in the Analytic Hierarchy Process , 1997 .
[77] William Bogard. The Bhopal Tragedy: Language, Logic, And Politics In The Production Of A Hazard , 1989 .
[78] H. Pasman. Loss prevention in the process industries , 2002 .
[79] Sarath C. Joshua,et al. A Causal Analysis of Large Vehicle Accidents Through Fault‐Tree Analysis , 1992 .
[80] Trevor Kletz,et al. Learning from Accidents , 2001 .
[81] Kyung S. Park,et al. A new method for estimating human error probabilities: AHP-SLIM , 2008, Reliab. Eng. Syst. Saf..
[82] Ali Emrouznejad,et al. Multi-criteria logistics distribution network design using SAS/OR , 2009, Expert Syst. Appl..
[83] Enrico Zio,et al. A Fuzzy Decision Tree for Fault Classification , 2008, Risk analysis : an official publication of the Society for Risk Analysis.
[84] Madjid Tavana,et al. A priority assessment multi-criteria decision model for human spaceflight mission planning at NASA , 2006, J. Oper. Res. Soc..
[85] Alessio Ishizaka,et al. Analytic Hierarchy Process and Expert Choice: Benefits and limitations , 2009, OR Insight.
[86] B. S. Ahn,et al. ERP system selection using a simulation-based AHP approach: a case of Korean homeshopping company , 2008, J. Oper. Res. Soc..
[87] Yohay Carmel,et al. Uses and Misuses of Multicriteria Decision Analysis (MCDA) in Environmental Decision Making , 2009, Risk analysis : an official publication of the Society for Risk Analysis.
[88] Seyed Hassan Ghodsypour,et al. A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming , 1998 .
[89] Tommaso Piazza,et al. A Quality Risk Management Model Approach for Cell Therapy Manufacturing , 2010, Risk analysis : an official publication of the Society for Risk Analysis.
[90] Gülfem Tuzkaya,et al. A two-phase possibilistic linear programming methodology for multi-objective supplier evaluation and order allocation problems , 2008, Inf. Sci..