Process plan and part routing optimization in a dynamic flexible job shop scheduling environment: an optimization via simulation approach
暂无分享,去创建一个
[1] Andrea Rossi,et al. Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method , 2007 .
[2] Ivan Tanev,et al. Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: application service provider approach , 2004, Appl. Soft Comput..
[3] Can Saygin,et al. Auction-based distributed scheduling and control scheme for flexible manufacturing systems , 2004 .
[4] Pierre Borne,et al. Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems , 2002, IEEE Trans. Syst. Man Cybern. Part C.
[5] Michael C. Fu,et al. Feature Article: Optimization for simulation: Theory vs. Practice , 2002, INFORMS J. Comput..
[6] Pierre Borne,et al. Ant systems & Local Search Optimization for flexible Job Shop Scheduling Production , 2007, Int. J. Comput. Commun. Control.
[7] Mostafa Zandieh,et al. Flexible job-shop scheduling with parallel variable neighborhood search algorithm , 2010, Expert Syst. Appl..
[8] Brian W. Hollocks,et al. Discrete-Event Systems Simulation , 1985 .
[9] F. Pezzella,et al. A genetic algorithm for the Flexible Job-shop Scheduling Problem , 2008, Comput. Oper. Res..
[10] Yasuhiro Tsujimura,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .
[11] Zhenyuan Jia,et al. Research on job-shop scheduling problem based on genetic algorithm , 2011 .
[12] Liang Gao,et al. An effective genetic algorithm for the flexible job-shop scheduling problem , 2011, Expert Syst. Appl..
[13] I. Moon,et al. Genetic algorithms for job shop scheduling problems with alternative routings , 2008 .
[14] Jesuk Ko,et al. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling , 2003, Comput. Oper. Res..
[15] Mitsuo Gen,et al. A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems , 2008, Comput. Oper. Res..
[16] Mohammad Saidi-Mehrabad,et al. Flexible job shop scheduling with tabu search algorithms , 2007 .
[17] Ismail Hakki Cedimoglu,et al. The strategies and parameters of tabu search for job-shop scheduling , 2004, J. Intell. Manuf..
[18] Andrew Y. C. Nee,et al. Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems , 2009 .
[19] Nhu Binh Ho,et al. Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems , 2008, Comput. Ind. Eng..
[20] Michael C. Fu,et al. Optimization for Simulation: Theory vs. Practice , 2002 .
[21] Adil Baykasoğlu,et al. Analysing the effect of flexibility on manufacturing systems performance , 2008 .
[22] Mostafa Zandieh,et al. A variable neighbourhood search algorithm for the flexible job-shop scheduling problem , 2010 .
[23] Haoxun Chen,et al. A genetic algorithm for flexible job-shop scheduling , 1999, Proceedings 1999 IEEE International Conference on Robotics and Automation (Cat. No.99CH36288C).
[24] F. Musharavati,et al. Modified genetic algorithms for manufacturing process planning in multiple parts manufacturing lines , 2011, Expert Syst. Appl..
[25] Iván García-Magariño,et al. Modular design of a hybrid genetic algorithm for a flexible job-shop scheduling problem , 2011, Knowl. Based Syst..
[26] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[27] Adil Baykasoglu,et al. New approaches to due date assignment in job shops , 2008, Eur. J. Oper. Res..
[28] Hyung Rim Choi,et al. A hybrid genetic algorithm for the job shop scheduling problems , 2003, Comput. Ind. Eng..
[29] Mitsuo Gen,et al. A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems , 2007, Comput. Ind. Eng..
[30] Adil Baykasoğlu,et al. Linguistic-based meta-heuristic optimization model for flexible job shop scheduling , 2002 .
[31] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[32] Hyerim Bae,et al. Hybrid genetic algorithm for group technology economic lot scheduling problem , 2006 .