Prequalification and multi-criteria selection: a measure of contractors' opinions

The procurement of a construction contractor normally involves some form of prequalification. The better prequalification regimes adopt a structured multi-criteria approach (i.e. contractor evaluation based on a multiple of factors over and above cost). This research solicits contractors' viewpoints on prequalification, in contrast to earlier works which have tended to present clients' perspectives. Contractors are dissatisfied with the frequency and adequacy of current prequalification regimes. An investigation of the mutual benefits of multi-criteria selection leads to the suggestion that such benefits could be better capitalized upon. Contractors' perceived levels of importance (with respect to selection criteria considered by clients during the selection process) are evaluated and show that, in line with earlier findings, 'cost' is still the predominant selection factor, followed by 'contractor experience' and 'company reputation'. A comparison between contractors' rankings of the selection criteria with similar rankings derived from an earlier survey of clients, finds significant correlation, indicating that contractors agree with clients' importance levels of multi-criteria selection factors.

[1]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[2]  Gary David Holt,et al.  A conceptual alternative to current tendering practice , 1993 .

[3]  Paul. Olomolaiye,et al.  Problems influencing craftsmen's productivity in Nigeria , 1987 .

[4]  Gary David Holt,et al.  A review of contractor selection practice in the U.K. construction industry , 1995 .

[5]  Gary David Holt,et al.  Evaluating performance potential in the selection of construction contractors , 1994 .

[6]  G. D. Holt,et al.  Applying multi-attribute analysis to contractor selection decisions , 1994 .

[7]  Gary David Holt,et al.  Evaluating prequalification criteria in contractor selection , 1994 .

[8]  Jeffrey S. Russell,et al.  Risk analysis approach to selection of contractor evaluation method , 1992 .

[9]  Gary David Holt,et al.  Application of an alternative contractor selection model , 1995 .

[10]  Thomas S. Ng,et al.  CP-DSS: Decision support system for contractor prequalification , 1995 .

[11]  G. D. Holt,et al.  Factors influencing U.K. construction clients' choice of contractor , 1994 .

[12]  Gary David Holt,et al.  Factors influencing UK construction clients' choice of contractors , 1994 .

[13]  Jeffrey S. Russell,et al.  QUALIFIER-1: CONTRACTOR PREQUALIFICATION MODEL , 1990 .

[14]  Gary David Holt,et al.  Tendering procedures, contractual arrangements and Latham: the contractors' view , 1996 .

[15]  Gary David Holt,et al.  Applying Cluster Analysis to Construction Contractor Classification , 1996 .

[16]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[17]  Miroslaw J. Skibniewski,et al.  DECISION CRITERIA IN CONTRACTOR PREQUALIFICATION , 1988 .