Calibration of a superconducting transformer by measuring critical current of a NbTi Rutherford cable
暂无分享,去创建一个
[1] Jun Lu,et al. Superconducting Transformer for Superconducting Cable Testing up to 45 kA , 2020, IEEE Transactions on Applied Superconductivity.
[2] N. Martovetsky,et al. Verification Testing of ITER Nb3Sn Strand at the NHMFL , 2015, IEEE Transactions on Applied Superconductivity.
[3] A Godeke,et al. A superconducting transformer system for high current cable testing. , 2010, The Review of scientific instruments.
[4] A. Verweij,et al. Critical Current Measurements of the Main LHC Superconducting Cables , 2007, IEEE Transactions on Applied Superconductivity.
[5] Arjan Verweij,et al. Superconducting Transformer and Regulation Circuit for the CERN cable test facility , 2006 .
[6] J. Genest,et al. 1.9 K test facility for the reception of the superconducting cables for the LHC , 1999, IEEE Transactions on Applied Superconductivity.
[7] A. Verweij. The Consequence of Self-Field and Non-Uniform Current Distribution on Short Sample Tests of Superconducting Cables , 1998 .
[8] G. Pásztor,et al. Design, Construction and Testing of a 50 kA Superconducting Transformer , 1990 .
[9] J. Eikelboom,et al. Critical Current Measurements of Prototype Cables for the CERN LHC Up to 50 kA and between 7 and 13 Tesla Using a Superconducting Transformer Circuit , 1990 .
[10] M. Garber,et al. The effect of self field on the critical current determination of multifilamentary superconductors , 1989 .