An interactive decision support system for an aggregate production planning model based on multiple criteria mixed integer linear programming

In this paper, we present an aggregate production planning (APP) model applied to a Portuguese firm that produces construction materials. A multiple criteria mixed integer linear programming (MCMILP) model is developed with the following performance criteria: (1) maximize profit, (2) minimize late orders, and (3) minimize work force level changes. It includes certain operational features such as partial inflexibility of the work force, legal restrictions on workload, work force size (workers to be hired and downsized), workers in training, and production and inventory capacity. The purpose is to determine the number of workers for each worker type, the number of overtime hours, the inventory level for each product category, and the level of subcontracting in order to meet the forecasted demand for a planning period of 12 months. Additionally, a decision support system (DSS) based on the MCMILP model is proposed. It will help practitioners find the "best" solution for an APP problem without having to familiarize themselves with the mathematical complexities associated with the model. An example to illustrate the use of the DSS is also included.

[1]  Reay-Chen Wang,et al.  Aggregate production planning with multiple objectives in a fuzzy environment , 2001, Eur. J. Oper. Res..

[2]  C. Holt,et al.  Derivation of a Linear Decision Rule for Production and Employment , 1956 .

[3]  Philippe Vincke,et al.  Multicriteria Decision-aid , 1993 .

[4]  Marc Despontin,et al.  Multiple Criteria Optimization: Theory, Computation, and Application, Ralph E. Steuer (Ed.). Wiley, Palo Alto, CA (1986) , 1987 .

[5]  J. Ashayeri,et al.  A Production Planning Model and a Case Study for the Pharmaceutical Industry in The Netherlands , 2003 .

[6]  Joao Paulo Brito da Silva,et al.  A labour-constrained model for aggregate production planning , 2000 .

[7]  Joseph M. Mellichamp,et al.  Production Switching Heuristics for the Aggregate Planning Problem , 1978 .

[8]  Terry R. Rakes,et al.  Aggregate production planning using chance-constrained goal programming , 1984 .

[9]  C. Hwang,et al.  An aggregate production planning model and application of three multiple objective decision methods , 1980 .

[10]  E. H. Bowman Consistency and Optimality in Managerial Decision Making , 1963 .

[11]  Curtis H. Jones Parametric Production Planning , 1967 .

[12]  Rasaratnam Logendran,et al.  Aggregate production planning — A survey of models and methodologies , 1992 .

[13]  E. H. Bowman Production Scheduling by the Transportation Method of Linear Programming , 1956 .

[14]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .

[15]  W. Taubert A Search Decision Rule for the Aggregate Scheduling Problem , 1968 .

[16]  W. Damon,et al.  A Simultaneous Decision Model for Production, Marketing and Finance , 1972 .

[17]  Brian H. Kleiner,et al.  Aggregate planning today , 1994 .

[18]  Sidney W. Hess,et al.  A Linear Programming Approach to Production and Employment Scheduling , 1960 .

[19]  David A. Goodman,et al.  A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .

[20]  Mahmoud M. Yasin,et al.  THE FINANCIAL ASPECTS OF AGGREGATE PRODUCTION PLANNING: AN APPLICATION OF TIME-PROVEN TECHNIQUES , 2000 .

[21]  Adil Baykasoğlu MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search , 2001 .

[22]  Christoph Haehling von Lanzenauer Production and employment scheduling in multistage production systems , 1970 .