Integration of dispatch and control based intelligent processing system research for equipment abnormal alarm signals
暂无分享,去创建一个
[1] Wang Li. Design and Implementation of Directing System for Disposing of Substation Abnormity , 2002 .
[2] He Xi-dian. Implementation of intelligent alarm and AMD system in the smart substation , 2011 .
[3] Yu Wei-yong. A SUBSTATION FAULT DIAGNOSIS SYSTEM BASED ON CASE-BASED REASONING AND RULE-BASED REASONING , 2004 .
[4] Jiang Hai. A Survey of Coordination Scheme Between CIM and IEC 61850 Model , 2011 .
[5] Dai Zhiwei,et al. Analysis on the Cause of Distribution Line’s Damage during Typhoon and Counteract Measures , 2010 .
[6] Mladen Kezunovic,et al. Intelligent Alarm Processing: From Data Intensive to Information Rich , 2009 .
[7] Li Peng. Study on Operating Modes of Hainan Power Grid during Typhoon Periods , 2007 .
[8] S Ji. Research on the Intelligent Alarm Expert System of Substation , 2011 .
[9] Gu Yin. Constitution and Implementation of Supplementary Decision System for Analysis and Handling of Abnormal Signal in Substation , 2004 .
[10] He Guangyu. Coordination between IEC 61850 and IEC 61970 for the Protection Model , 2006 .
[11] Tao Wen-wei. Intelligent processing system research and design for equipment abnormal and fault signals in regional power grid , 2009 .