Study of the Scheduling Rules of Short-term Power Generation Dispatching for Single Hydropower Station

Short-term optimal operation of hydropower station is a high-dimensional, multi-constraint and complex system problem. In this paper, Liyuan hydropower station located in the middle reaches of Jinsha River is cited as an example, and the mathematical model of optimal power generation dispatching has been established. We obtain a large amount of optimal scheduling processes by using the progressive optimality algorithm (POA). Then, the corresponding scheduling rules for single hydropower station which can take advantage of runoff prediction results are derived. A case indicates that the scheduling rules can be effectively used to guide the actual operation run of Liyuan hydropower station.

[1]  Wu Yue-qiu Drawing of the reservoir operation chart based on the particle swarm optimization algorithm , 2010 .

[2]  Mei Yadong,et al.  Research of Hydropower Stations Optimal Operation Based on the Discrete Differential Dynamic Programming - Progressive Optimization Algorithm Combination Method , 2009, 2009 Seventh ACIS International Conference on Software Engineering Research, Management and Applications.

[3]  L. Lakshminarasimman,et al.  A modified hybrid differential evolution for short-term scheduling of hydrothermal power systems with cascaded reservoirs , 2008 .

[4]  Yu Shan Optimization of the reservoir operation chart of hydropower station and its application——based on hybrid genetic algorithm and simulated annealing , 2010 .

[5]  Fang Liu,et al.  Instructional Mutation Ant Colony Algorithm in Application of Reservoir Operation Chart Optimization , 2011, 2011 Fourth International Symposium on Knowledge Acquisition and Modeling.

[6]  Jiqing Li,et al.  Application of immune algorithm-based particle swarm optimization for optimized load distribution among cascade hydropower stations , 2009, Comput. Math. Appl..

[7]  Juan I. Pérez-Díaz,et al.  Short-term operation scheduling of a hydropower plant in the day-ahead electricity market , 2010 .

[8]  D. P. Kothari,et al.  Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data , 1986 .

[9]  Ju-Hwan Yoo,et al.  Maximization of hydropower generation through the application of a linear programming model , 2009 .