Hierarchical control of production flow based on capacity allocation for real-time scheduling of manufacturing systems

This paper considers the modelling and simulation of a hierarchical production-flow control system. It uses a continuous control approach for machine capacity allocation at the design level and real time scheduling at the shop-floor level. Particularly, at the design level, the control of machine throughput has been addressed by a set of distributed and supervised fuzzy controllers. The objective is to adjust the machine's production rates in such a way that satisfies the demand while maintaining the overall performances within acceptable limits. At the shop-floor level, the problem of scheduling of jobs is considered. In this case, the priority of jobs (actual dispatching times) is determined from the continuous production rates through a discretisation procedure. A case study demonstrates the efficiency of the proposed methodology through a simulation case study.

[1]  Georges Habchi,et al.  A model for manufacturing systems simulation with a control dimension , 2003, Simul. Model. Pract. Theory.

[2]  Stanley B. Gershwin Design and operation of manufacturing systems: the control-point policy , 2000 .

[3]  C Gertosio,et al.  Modeling and simulation of the control framework on a flexible manufacturing system , 2000 .

[4]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[5]  Didier Dubois,et al.  On the use of aggregation operations in information fusion processes , 2004, Fuzzy Sets Syst..

[6]  Sylvie Galichet,et al.  An educational tool for fuzzy control , 2006, IEEE Transactions on Fuzzy Systems.

[7]  B Grabot Artificial intelligence and soft computing for planning and scheduling: how to efficiently solve more realistic problems... , 2001 .

[8]  Michio Sugeno,et al.  On stability of fuzzy systems expressed by fuzzy rules with singleton consequents , 1999, IEEE Trans. Fuzzy Syst..

[9]  Peter Brucker,et al.  A Branch and Bound Algorithm for the Job-Shop Scheduling Problem , 1994, Discret. Appl. Math..

[10]  Jan-Wilhelm Breithaupt,et al.  Automatic production control applying control theory , 2000 .

[11]  Sylvie Galichet,et al.  MIN and MAX Operators for Fuzzy Intervals and Their Potential Use in Aggregation Operators , 2007, IEEE Transactions on Fuzzy Systems.

[12]  George J. Klir,et al.  Fuzzy arithmetic with requisite constraints , 1997, Fuzzy Sets Syst..

[13]  Karim Tamani,et al.  Intelligent distributed and supervised flow control methodology for production systems , 2009, Eng. Appl. Artif. Intell..

[14]  Lefteris Doitsidis,et al.  Work-in-process scheduling by evolutionary tuned fuzzy controllers , 2007 .

[15]  Kimon P. Valavanis,et al.  Fuzzy supervisory control of manufacturing systems , 2004, IEEE Transactions on Robotics and Automation.

[16]  Michio Sugeno,et al.  Fuzzy identification of systems and its applications to modeling and control , 1985, IEEE Transactions on Systems, Man, and Cybernetics.

[17]  Sylvie Galichet,et al.  Explicit analytical formulation and exact inversion of decomposable fuzzy systems with singleton consequents , 2004, Fuzzy Sets Syst..

[18]  Nikos Tsourveloudis,et al.  Fuzzy work-in-process inventory control of unreliable manufacturing systems , 2000, Inf. Sci..

[19]  Z. B. Jiang,et al.  Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system , 2009, Comput. Oper. Res..

[20]  Manolis A. Christodoulou,et al.  Real-time control of manufacturing cells using dynamic neural networks , 1999, Autom..

[21]  Sylvie Galichet,et al.  Inverse Arithmetic Operators for Fuzzy Intervals , 2007, EUSFLAT Conf..

[22]  Sohyung Cho,et al.  Distributed adaptive control of production scheduling and machine capacity , 2007 .