A Risk Management Approach for Prediction of Contingency Sum for Public-Sector Construction Projects

A review of the literature supports the inclusion of sufficient contingency to cover risks in construction projects. From the client’s point of view, too much contingency may result in a project being aborted or uneconomical and too little may lead to cost escalation if the risk occurs. Risk factors at the construction phase causing cost overruns will be identified and an accurate method for estimation of contingency sum will be determined. Qualitative interviews were conducted with five expert practitioners working in a public works department in Zambia to determine how the contingency sum is estimated and what risk factors are considered. Multiple regression analysis was conducted using cost and risks data collected from 30 building and refurbishment projects recently completed in the department. The qualitative study found that project budget overruns constitute a major issue. The regression analysis results proved that the contingency sum was positively correlated to the estimated contract sum. The qualitative interview results and Pearson correlation coefficient showed there was also a positive correlation between contingency sum and project complexity, although such factor needs to be further reaffirmed by regression analysis using a larger sample size. To enhance project success in terms of cost, it is necessary that project managers should actively implement risk management in projects when calculating the contingency sum. Related project-specific risks should be identified and multiple regression method can be used to predict the contingency fund accordingly.

[1]  Stephen O. Ogunlana,et al.  A methodology for project control through risk analysis: the case of a pipeline project , 1993, Proceedings of Engineering Management Society Conference on Managing Projects in a Borderless World.

[2]  Rolf Olsson,et al.  MANAGING PROJECT UNCERTAINTY BY USING AN ENHANCED RISK MANAGEMENT PROCESS , 2006 .

[3]  Ali Touran Calculation of contingency in construction projects , 2003, IEEE Trans. Engineering Management.

[5]  Douglas D. Gransberg,et al.  Managing geotechnical risk on us design-build transport projects , 2014 .

[6]  Sung Hoon An,et al.  Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .

[7]  Arazi Idrus,et al.  Development of project cost contingency estimation model using risk analysis and fuzzy expert system , 2011, Expert Syst. Appl..

[8]  Honorius Makombo Makombo The risk management framework for organisations dealing with construction project management in South Africa , 2012 .

[9]  Aayushi Gupta,et al.  Exploring Risk Dimensions in the Indian Software Industry , 2011 .

[10]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[11]  E. Kutsch,et al.  Deliberate ignorance in project risk management , 2010 .

[12]  Abera Joseph John Clinton Factors influencing the final cost of construction projects in Ghana , 2015 .

[13]  David Arditi,et al.  Budgeting Owner's Construction Contingency , 2007 .

[14]  David Baccarini Estimating project cost continency - a model and exploration of research questions , 2004 .

[15]  David Baccarini The maturing concept of estimating project cost contingency: A review , 2006 .

[16]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[17]  Alfred E. Thal,et al.  Estimation of Cost Contingency for Air Force Construction Projects , 2010 .

[18]  Ismail Abdul Rahman,et al.  Factors affecting construction cost performance in project management projects: Case of MARA large projects , 2014 .

[19]  Richard Levin,et al.  Statistics for Management. , 1979 .

[20]  Gary Jackson Contingency for Cost Control in Project Management: A Case Study , 2003 .

[21]  Joseph A. Demkin Security planning and design : a guide for architects and building design professionals , 2004 .

[22]  Ibrahim Mahamid,et al.  Early cost estimating for road construction projects using multiple regression techniques , 2011 .

[23]  Hemanta Doloi,et al.  Understanding impacts of time and cost related construction risks on operational performance of PPP projects , 2012 .