Starting up rapid-start units for reserve contributions in a system with interruptible loads

This study presents the effect of starting reliability of rapid-start units (RSUs), such as open-cycle gas turbines (OCGTs) and hydro generators, for energy scheduling and reserve allocation. A method that explicitly integrates unit starting reliability into the expected energy not served (EENS) formulation for non-spinning reserve (NR) contribution is proposed. A unit commitment objective function is used to incorporate the various types of energy/reserve providers and to schedule energy and reserve simultaneously. These providers are conventional thermal units, OCGTs, hydro units and interruptible loads. An EENS model that considers these energy/reserve providers and accounts for their response times is presented pictorially. A penalty cost formulation for RSUs that failed to start up for NR contribution is proposed. This work emphasises the importance of modelling units of varying starting reliability. These results could be used to assist independent system operators and generation companies when selecting energy/reserve sources for power generation and reserve contribution.

[1]  Mahmud Fotuhi-Firuzabad,et al.  Generating system operating health analysis considering stand-by units, interruptible load and postponable outages , 1994 .

[2]  Goran Strbac,et al.  A method for computing the value of corrective security , 1998 .

[3]  F. Bouffard,et al.  An electricity market with a probabilistic spinning reserve criterion , 2004, IEEE Transactions on Power Systems.

[4]  R. Jabr,et al.  Statistical Representation of Distribution System Loads Using Gaussian Mixture Model , 2010 .

[5]  L. T. Anstine,et al.  Application of Probability Methods to the Determination of Spinning Reserve Requirements for the Pennsylvania-New Jersey-Maryland Interconnection , 1963 .

[6]  David Kendrick,et al.  GAMS, a user's guide , 1988, SGNM.

[7]  Bikash C. Pal,et al.  Intermittent wind generation in optimal power flow dispatching , 2009 .

[8]  C. Floudas Nonlinear and Mixed-Integer Optimization: Fundamentals and Applications , 1995 .

[9]  Jianxue Wang,et al.  Operating reserve model in the power market , 2005 .

[10]  Daniel S. Kirschen,et al.  Optimising the spinning reserve requirements considering failures to synchronise , 2008 .

[11]  M. J. Bartos,et al.  Reliability survey of 600 to 1800 kW diesel and gas-turbine generating units , 1990 .

[12]  C. Singh,et al.  Operating Considerations in Generation Reliability Modeling-An Analytical Approach , 1981, IEEE Transactions on Power Apparatus and Systems.

[13]  R. H. Myers,et al.  Probability and Statistics for Engineers and Scientists , 1978 .

[14]  T. E. Ekstrom Reliability/availability guarantees of gas turbine and combined cycle generating units , 1994 .

[15]  Bala Venkatesh,et al.  A probabilistic reserve market incorporating interruptible load , 2006 .

[16]  Roy Billinton,et al.  Reliability evaluation of power systems , 1984 .

[17]  Roy Billinton,et al.  Operating reserve assessment in interconnected generating systems , 1988 .

[18]  D. Kirschen Demand-side view of electricity markets , 2003 .

[19]  M. Shahidehpour,et al.  Unit Commitment With Probabilistic Spinning Reserve and Interruptible Load Considerations , 2009, IEEE Transactions on Power Systems.

[20]  G. Strbac,et al.  Framework for the incorporation of demand-side in a competitive electricity market , 1996 .

[21]  C. W. Yu,et al.  Modelling and evaluation of interruptible-load programmes in electricity markets , 2005 .

[22]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .